40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 2744     Entry time: Wed Mar 31 16:55:05 2010
Author: josephb 
Type: Update 
Category: Computers 
Subject: 2 computers from Alex and Rolf brought to 40m 

I went over to Downs today and was able to secure two 8 core machines, along with mounting rails.  These are very thin looking 1U chassis computers. I was told by Rolf the big black box computers might be done tomorrow afternoon.  Alex also kept one of the 8 core machines since he needed to replace a hard drive on it, and also wanted to keep for some further testing, although he didn't specify how long.

I also put in a request with Alex and Rolf for the RCG system to produce code which includes memory location hooks for plant models automatically, along with a switch to flip from the real to simulated inputs/outputs.

 

ELOG V3.1.3-