Entry  Tue Mar 2 23:11:43 2010, Koji, Update, SUS, ITMX hung 
    Reply  Wed Mar 3 02:57:29 2010, Jenne, Update, SUS, ITMX hung 
    Reply  Fri Mar 5 11:21:18 2010, steve, Update, SUS, used OSEMs are magnetic 
       Reply  Fri Mar 5 18:04:56 2010, rana, Update, SUS, used OSEMs are magnetic 
Message ID: 2652     Entry time: Wed Mar 3 02:57:29 2010     In reply to: 2651
Author: Jenne 
Type: Update 
Category: SUS 
Subject: ITMX hung 

Quote:

Jenne and Koji

We successfully hung ITMX on the SOS. Side magnet is ~2mm off from the center of the OSEM.

Reguled ITMY side magnet.

Cleaned up the lab for the safety inspection.

 Some details on the side magnet situation from today: 

To glue the magnets+dumbbells to the optics, we use the magnet-dumbbell gluing fixture.  This fixture is supposed to have teflon 'pads' for the optic to sit on while you align it in the fixture, however the fixture which we received from MIT (it's Betsy's....but it came via MIT) only had one of the 4 teflon pads. 

Kiwamu and I decided (last week, when we first glued ITMX's magnets) that it would be bad news to let the AR face of the optic sit on bare metal, so we fashioned up some teflon pads using stock in a cabinet down the Yarm.  We were focused on thinking about the face magnets, and didn't think about how the thickness of the teflon affected the placement of the side magnet.  We chose some teflon that was too thin by ~1mm, so the optic sat too low in the fixture, resulting in the side magnet being glued too close to the HR side of the optic (this is all along the Z - axis, where Z is the direction of beam propagation). 

Why it ended up being 2mm off instead of only 1mm I don't really have an explanation for, other than perhaps tightening the set screws to hold the optic (by the barrel) in the fixture pushes the optic up.  I observed this happening when I didn't put any effort into keeping the optic flat on the teflon pads, but I thought that I made sure the optic was seated nicely in the fixture before starting to glue.  When I glued the new ITMY side magnet tonight I tried to make sure that the optic was seated nicely in the fixture.  We'll see what happens.

Before gluing the new ITMY side magnet (and now it's set for all future magnet gluings....), I found 4 teflon pads of all the correct thickness.  It turns out that we have a magnet gluing fixture of our own, which I found in the cabinets in the clean room.  This fixture had all 4 teflon pads, so I stole them and put them into the one that we're using for this round of upgrade / suspension hangings.  The height of all future side magnets should be correct. The thickness of the pads in the 'spare' fixture matched the one which came with the fixture from MIT as closely as I could feel by putting them on the same flat surface next to each other and feeling if there was a step. 

A side note about this magnet gluing fixture that I found:  It has the word "TOP" etched into it, to prevent exactly my problem with the ITMY side magnets in the first place.  Unfortunately the threads for the set screws which hold the optic are shot (or something is funny with them), so we can't just use this fixture. 

Gluing notes regarding the standoffs and guiderods:

There's more glue than I'd like on the guiderods / standoff for ITMX.  The glue was starting to get a little tacky when I glued the standoff in place after we balanced the optic, so it was hard to get it in the right place.  I'm confident we have a good epoxy contact, and we don't have much glue that I think it'll be a big problem.  Certainly I'll be a lot better at manuvering my glue-stick a.k.a skinny piece of wire around the suspension tower to get to the standoff for the rest of the optics that we're hanging, and I won't have glued something like ITMY side magnet immediately beforehand, which took enough time that the glue started to get tacky (not very tacky, just barely noticeably tacky).

I'd say that most gluing activities should be completed within ~10-15min of mixing the glue, after spending ~2min stirring to make sure it's nice and uniform.  It doesn't dry fast enough to be a huge rush, but you should get right on the gluing once the epoxy has been mixed. 

ELOG V3.1.3-