The Vac pressure measured at P1 is at 2.5mTorr. I expect we'll hit 3mTorr sometime this afternoon, at which point (according to Steve) the interlock will shut the shutter, and we won't have light in the IFO. Anything which needs to happen with light in the IFO before Monday needs to happen fairly soon. |