40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Feb 12 18:58:46 2010, kiwamu, Update, Green Locking, take some optics away from the ETM end table DSC_1164.JPGDSC_1172.JPG
    Reply  Tue Feb 16 09:51:22 2010, Alberto, Update, Green Locking, take some optics away from the ETM end table 
       Reply  Tue Feb 16 11:12:51 2010, kiwamu, Update, Green Locking, Re:take some optics away from the ETM end table 
          Reply  Tue Feb 16 16:24:30 2010, kiwamu, Update, Green Locking, Re:Re:take some optics away from the ETM end table 
Message ID: 2609     Entry time: Tue Feb 16 16:24:30 2010     In reply to: 2606
Author: kiwamu 
Type: Update 
Category: Green Locking 
Subject: Re:Re:take some optics away from the ETM end table 

I put the TRY_PD back to the end table and aligned it. Now it seems to be working well.

Quote:

The PD Kiwamu removed from the Y table was TRY, which we still need.

My bad if he took that. By mistake I told him that was the one I installed on the table for the length measurement and we didn't need it anymore.

I'm going to ask Kiwamu if he can kindly put it back.

 I am going to put the PD back to the Y end table in this afternoon.

 

ELOG V3.1.3-