40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Feb 12 18:58:46 2010, kiwamu, Update, Green Locking, take some optics away from the ETM end table DSC_1164.JPGDSC_1172.JPG
    Reply  Tue Feb 16 09:51:22 2010, Alberto, Update, Green Locking, take some optics away from the ETM end table 
       Reply  Tue Feb 16 11:12:51 2010, kiwamu, Update, Green Locking, Re:take some optics away from the ETM end table 
          Reply  Tue Feb 16 16:24:30 2010, kiwamu, Update, Green Locking, Re:Re:take some optics away from the ETM end table 
Message ID: 2604     Entry time: Tue Feb 16 09:51:22 2010     In reply to: 2601     Reply to this: 2606
Author: Alberto 
Type: Update 
Category: Green Locking 
Subject: take some optics away from the ETM end table 

Quote:

In the last two days Steve and I took some optics away from the both ETM end table.

This is because we need an enough space to set up the green locking stuff into the end table, and also need to know how much space is available.

Optics we took away are : Alberto's RF stuff, fiber stuff and some optics obviously not in used.

The picture taken after the removing is attached. Attachment1:ETMX, Attachment2:ETMY

And the pictures taken before the removing are on the wiki, so you can check how they are changed.

http://lhocds.ligo-wa.caltech.edu:8000/40m/Optical_Tables

The PD Kiwamu removed from the Y table was TRY, which we still need.

My bad if he took that. By mistake I told him that was the one I installed on the table for the length measurement and we didn't need it anymore.

I'm going to ask Kiwamu if he can kindly put it back.