0) The ETMY oplev needs work/centering
1) recentered DRMI oplevs
2) Did some light DRMI locking. Looked at the loops and the DD signals. The PODD signals look flaky; the beam may not be on the diode. MICH and PRC handoffs to DD signals were spotty, but not a total disaster. Changed the PD9 phase by 115 degs. Work continues on the DD_handoff subscript.
3) John says "There are ants everywhere."
4) Andrey is now versed in the arts of decimation. |