40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Nov 20 16:18:56 2009, rob, Configuration, SUS, watchdog rampdown 
    Reply  Mon Nov 23 11:03:00 2009, steve, Update, SUS, jackhammer special well under control dig10d.pngP1050740.JPG
Message ID: 2313     Entry time: Mon Nov 23 11:03:00 2009     In reply to: 2309
Author: steve 
Type: Update 
Category: SUS 
Subject: jackhammer special well under control 

Quote:

I've changed the watchdog rampdown script so it brings the SUS watchdogs to 220, instead of the 150 it previously targeted.  This is to make tripping less likely with the jackhammering going on next door.  I've also turned off all the oplev damping.

 Saturday's special event of braking up the large concrete pieces in CES bay was un event full.

Attachment 1: dig10d.png  27 kB  | Hide | Hide all
dig10d.png
Attachment 2: P1050740.JPG  153 kB  | Hide | Hide all
P1050740.JPG
ELOG V3.1.3-