40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Oct 12 17:27:20 2009, Koji, Configuration, SAFETY, Stray beam blocking PSL.png
    Reply  Mon Oct 12 18:38:07 2009, Jenne, Configuration, SAFETY, Stray beam blocking 
       Reply  Mon Oct 12 20:01:13 2009, Koji, Configuration, SAFETY, Stray beam blocking 
          Reply  Mon Oct 12 22:15:15 2009, rana, Configuration, PSL, Stray beam blocking 
    Reply  Mon Oct 12 19:53:44 2009, Koji, Configuration, SAFETY, Stray beam blocking 
Message ID: 2088     Entry time: Mon Oct 12 22:15:15 2009     In reply to: 2087
Author: rana 
Type: Configuration 
Category: PSL 
Subject: Stray beam blocking 

You can remove the RFAM measuring setup. Once we upgrade, we will no longer have a MZ or the related problems.

ELOG V3.1.3-