40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Oct 8 20:18:56 2009, Koji, Summary, General, Arm cavity loss 
    Reply  Thu Oct 8 21:32:59 2009, Koji, Summary, General, Recycling cavity loss 
Message ID: 2071     Entry time: Thu Oct 8 21:32:59 2009     In reply to: 2070
Author: Koji 
Type: Summary 
Category: General 
Subject: Recycling cavity loss 

I looked at the data of the day before yesterday (Oct 06) to know how much is the recycling gain.

X arm: (TRX_PRecycled) / (TRX_PRMmisaligned) * T_PRM = 83.1/0.943*0.07 = 6.17
Y arm: (TRX_PRecycled) / (TRX_PRMmisaligned) * T_PRM = 99.2/1.017*0.07 = 6.83

==> G_PR = 6.5 +/- 0.5     (oh...this estimation is so bad...)

From the recycling gain and the arm cavity reflectance, one can get the loss in the recycling cavity.

G_PR = T_PRM  / (1-Sqrt(R_PRM * (1-L_PRC)*R_cav))^2

==> loss in the recycling cavity L_PRC: 0.009+/-0.009
       (About 1% loss is likely in the recycling cavity)

Quote:

<<X arm>>
Measured arm reflectivity R_cav: 0.875 +/- 0.005
Estimated round trip loss L_RT: 157ppm +/- 8ppm
Estimated finesse F: 1213+/-2

<<Y arm>>
Measured arm reflectivity R_cav:
0.869 +/- 0.006
Estimated round trip loss L_RT: 166ppm +/- 8ppm
Estimated finesse F: 1211+/-2

 

ELOG V3.1.3-