40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 1881     Entry time: Mon Aug 10 17:49:10 2009
Author: pete 
Type: Update 
Category: Computers 
Subject: RCG work - plans 

Pete, Koji

 

We discussed a preliminary game plan for this project.  The thing I really want to see is an ETMX RCG controller hooked into the existing frontend via reflective memory, and the 40 m behaving normally with this hybrid system, and my list is geared toward this.  I suspect the list may cause controversy.

+ copy the MDC filters into SAM, and make sure everything looks good there with DTT and SR785.

+ get interface / wiring boards from Wilson House, to go between megatron and the analog ETMX system

+ test tying the ETMX pendulum and bare-bones SAM together (use existing watchdogs, and "bare-bones" needs defining)

+ work some reflective memory magic and create the hybrid frontend

 

In parallel with the above, the following should also happen:

+ MEDM screen design

+ add non-linear bits to the ETMX MDP/MDC model system

+ make game plan for the rest of the RCG frontend

ELOG V3.1.3-