Entry  Fri Aug 7 20:43:35 2009, Clara, Jenne, Rana, Jan, Update, PEM, Two Guralps plugged in, prepped for huddle test Untitled.png
    Reply  Sat Aug 8 17:19:07 2009, rana, Update, PEM, Two Guralps plugged in, prepped for huddle test Untitled.png
Message ID: 1866     Entry time: Fri Aug 7 20:43:35 2009     Reply to this: 1868
Author: Clara, Jenne, Rana, Jan 
Type: Update 
Category: PEM 
Subject: Two Guralps plugged in, prepped for huddle test 

Both Guralps and the Ranger have been placed in our nice new insulated foam box, complete with packing peanuts, in the corner between the x and y arms. The Guralp breakout box has been reinstalled and everything is plugged in in prepartion for the huddle test. However, we're having some issues with ADC channels, which will be worked out tomorrow (hopefully) so that data can be collected over the weekend.

Currently, one Guralp is plugged into the three SEIS-MC1 channels. We made new channels for the second Guralp (GUR-EW, GUR-NS, and GUR-VERT), but had issues with those. So, EW and NS have been plugged into PEM_AUDIO-MIC1 and MIC2 for the time being.

Attachment 1: Untitled.png  60 kB  Uploaded Sat Aug 8 16:14:16 2009  | Hide | Hide all
Untitled.png