40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 17078     Entry time: Fri Aug 12 13:40:36 2022
Author: JC 
Type: Update 
Category: General 
Subject: Preparing for Shutdown on Saturday, Aug 13 

[Yehonathan, JC]

Our first step in preparing for the Shutdown was to center all the OpLevs. Next is to prepare the Vacuum System for the shutdown.

 

ELOG V3.1.3-