40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Jun 22 18:55:31 2022, yuta, Update, LSC, Daily alignment work; POY trouble solved Screenshot_2022-06-22_17-17-42_XYaligned.pngScreenshot_2022-06-22_18-58-26_Transmission.png
    Reply  Wed Jun 22 19:41:13 2022, Koji, Update, LSC, Daily alignment work; POY trouble solved 
Message ID: 16941     Entry time: Wed Jun 22 19:41:13 2022     In reply to: 16940
Author: Koji 
Type: Update 
Category: LSC 
Subject: Daily alignment work; POY trouble solved 

Before the final measurement of the DC values for the transmissions, I aligned the PMC. This made the PMC trans increased from 0.67 to 0.74.

ELOG V3.1.3-