40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Wed May 25 16:56:44 2022, Paco, Configuration, BHD, IFO recovery - IMC alignment
|
Wed May 25 17:34:47 2022, yuta, Configuration, BHD, IFO recovery - IFO alignment
|
Thu May 26 19:55:43 2022, yuta, Configuration, BHD, Oplevs centered, BHD DCPDs are now online    
|
Fri May 27 17:45:53 2022, yuta, Configuration, BHD, BHD camera installed, GRY aligned
|
Thu Jun 2 20:05:37 2022, yuta, Configuration, PSL, IMC input power recovered to 1W, some alignment works 
|
Fri Jun 3 12:13:58 2022, Paco, Configuration, CDS, Fix RFM channels
|
Fri Jun 3 15:22:51 2022, yuta, Update, LSC, Both arms locked with POY/POX, IR beam centered on TMs with ASS 
|
Fri Jun 3 17:42:50 2022, yuta, Update, LSC, MICH locks with AS55_Q
|
Sun Jun 5 19:46:40 2022, Paco, Update, LSC, Fixed IMC Trans sum issue
|
Mon Jun 6 13:35:11 2022, Paco, Update, LSC, First calibrated spectra of MICH at AS55 Q 
|
Fri Jun 17 16:22:21 2022, yuta, Update, LSC, Actuator calibration of BS. ITMX, ITMY, updated MICH displacement spectra from c1cal 6x
|
Thu Jul 7 18:18:19 2022, yuta, Update, LSC, Actuator calibration of ETMX and ETMX  
|
Thu Jul 7 18:22:12 2022, yuta, Update, LSC, Actuator calibration of MC2 using Yarm 
|
Fri Jul 8 16:18:35 2022, rana, Update, LSC, Actuator calibration of MC2 using Yarm
|
Mon Jul 18 17:07:12 2022, yuta, Update, LSC, x4.12 added to ETMX coil outputs to balance with ETMY
|
Thu Jun 16 18:23:15 2022, Paco, Configuration, BHD, Recovering LO beam in BHD DCPDs
|
Tue Jun 21 14:17:50 2022, yuta, Configuration, BHD, BHD DCPDs re-routed to c1sus2 
|
Tue Jul 19 16:00:34 2022, yuta, Configuration, BHD, Fast channels for BHD DCPDs now available in c1lsc but not in c1hpc  
|
Thu Jul 21 21:50:47 2022, Tega, Configuration, BHD, c1sus2 IPC update
|
Fri Jul 22 15:05:26 2022, Tega, Configuration, BHD, c1sus2 shared memory and ADC fix   
|
Fri Jul 22 17:46:10 2022, yuta, Configuration, BHD, c1sus2 watchdog update and DCPD ERR channels
|
Mon Jul 25 17:58:10 2022, Tega, Configuration, BHD, c1sus2 IPC dolphin issue update   
|
Mon Aug 1 18:42:39 2022, Tega, Configuration, BHD, c1sus2 IPC dolphin issue update  
|
Tue Aug 2 17:25:18 2022, Tega, Configuration, BHD, c1sus2 dolphin IPC issue solved 
|
Mon Jul 25 18:09:41 2022, Tega, Configuration, BHD, BHD Homodyne Phase control MEDM screen 
|
|
Message ID: 16880
Entry time: Fri May 27 17:45:53 2022
In reply to: 16877
Reply to this: 16886
|
Author: |
yuta |
Type: |
Configuration |
Category: |
BHD |
Subject: |
BHD camera installed, GRY aligned |
|
|
[JC, Paco, Yuta]
After the IFO recovery (elog 40m/16881), we installed an analog camera for BHD fringe using a BNC cable for old SRMF camera so that we can see it from the control room.
We also aligned AS-LO using LO1,LO2 and AS4.
We then aligned GRY injection to get maximum GTRY.
Maximum TEM00s right now are
C1:SUS-ETMX_TRX_OUT_DQ ~0.1
C1:SUS-ETMY_TRY_OUT_DQ ~0.05
C1:ALS-TRX_OUT_DQ ~0.20
C1:ALS-TRY_OUT_DQ ~0.18 |