Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
|
Wed May 4 13:09:42 2022, Anchal, Update, BHD, IMC table balanced again, IMC is locking, YARM is locking
|
Wed May 4 15:08:59 2022, Tega, Update, BHD, XARM alignment to get flashing
|
Wed May 4 18:52:43 2022, Tega, Update, BHD, POP beam too high at POP SM4 on the ITMX chamber
|
Thu May 5 14:46:22 2022, Anchal, Update, BHD, POP beam height lowered, POP_SM4 raised
|
Thu May 5 17:05:31 2022, Tega, Update, BHD, IMC & X/Y-arm alignment
|
Mon May 9 18:43:03 2022, Anchal, Update, BHD, ITMX table layout corrected
|
Mon May 9 18:49:05 2022, Tega, Update, BHD, Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table 
|
Tue May 10 15:46:38 2022, JC, Update, BHD, Relocate green TRX and TRY components from PSL table to BS table 
|
Tue May 10 18:25:43 2022, Paco, Update, BHD, Green Transmission path
|
Tue May 10 16:31:14 2022, Tega, Update, BHD, ITMX optlev return beam steered to QPD
|
Fri May 6 13:48:34 2022, Anchal, Update, BHD, WFS loop instability fixed
|
Thu May 12 19:55:01 2022, Tega, Update, BHD, AS path alignment 
|
Thu May 12 20:11:18 2022, Anchal, Update, BHD, BHDBS Output beams steered out to ITMY table
|
Thu May 12 20:24:29 2022, yuta, Update, BHD, POX and POY investigation
|
Mon May 16 13:22:59 2022, yuta, Update, BHD, REFL and AS paths aligned at AP table 
|
Mon May 16 19:14:17 2022, Anchal, Update, BHD, Camera set on AS path and BHDBS output path
|
Tue May 17 18:43:38 2022, Anchal, Update, BHD, Placed SRM in ITMY Chamber
|
Wed May 18 08:30:29 2022, Paco, Update, BHD, SRM OpLev
|
Thu May 19 08:51:40 2022, Paco, Update, BHD, SRM OpLev
|
Wed May 18 09:02:52 2022, Anchal, Update, BHD, WFS1 PD centered
|
Wed May 18 17:23:15 2022, Anchal, Update, BHD, Placed PRM in BS Chamber
|
Thu May 19 18:56:08 2022, yuta, Update, BHD, Current OSEM sensor values with all the suspensions aligned
|
Thu May 19 19:05:59 2022, Anchal, Update, BHD, BS Chamber all work finished, BHD path setup
|
Fri May 20 20:03:48 2022, Paco, Update, BHD, ITMY chamber work finished - LO and AS overlapped 
|
Mon May 23 13:16:59 2022, Paco, Update, BHD, End of vent - checks  
|
Tue May 24 15:21:13 2022, Anchal, Update, BHD, Freeswing tests of new SOS started
|
|
Message ID: 16872
Entry time: Tue May 24 15:21:13 2022
In reply to: 16869
|
Author: |
Anchal |
Type: |
Update |
Category: |
BHD |
Subject: |
Freeswing tests of new SOS started |
|
|
I modified the script freeSwing.py to use damping loop output switches to free the optic instead of watchdog or coil output filters. This ensures that the free swing test is being done at the nominal position of the optic. I started tests for LO1, LO2, As2, As4, PR2, PR3, and SR2 in a tmux session names freeSwing on rossa.
Note: LO2 face OSEMs are hardly sensitive to any motion right now due to excessive pitch offset required for LO beam. We should relieve this offset to LO1 and rerun this test later. |