[Paco, Yuta]
Prep for closing and pump down.
- Aligned IFO to maximize DC levels.
- YARM (flashing peak 0.05 with PRM misaligned), XARM (flashing peak 0.06 with PRM misaligned), PRC (PRY flashing -30 @ POPDC, offset -70 and REFL DC 270), SRC (SRY flashing -30 @ POPDC, offset -70), BHD.
- GTRY clipping
- We tried moving the alignment of PR3, PR2, ETMY, ITMY to reduce clipping and retain IR flashing. We found it kind of difficult, so we only used the unclipped GTRY temporarily to improve the input YAUX injection after which the YAUX locked. We then restored the clipping in favor of the IR beam alignment.
- PR3 position
- PR3 seems to be +1 inch away towards East, nominally placed along North-South, and offset in YAW.
- Aligned OPLEVs to center at around Mon May 23 13:20:32 2022
- Snapshot of all cameras in the control room around Mon May 23 13:24:51 2022
[Chub, JC, Jordan, Yuta, Yehonathan, Paco]
Closed in the following order:
- IMC chamber
- OMC chamber
- BS chamber
- ITMY chamber
- ITMX chamber
[Yuta, Paco]
After closing the heavy doors, we tried to have GTRY less clipped using PR2, PR3, ITMY and ETMY. During this adventure, we also aligned GRY injection beam by hand. Rotating a waveplate for GRY injection made GRY locking stably at GTRY of ~0.3.
|