Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
|
Wed May 4 13:09:42 2022, Anchal, Update, BHD, IMC table balanced again, IMC is locking, YARM is locking
|
Wed May 4 15:08:59 2022, Tega, Update, BHD, XARM alignment to get flashing
|
Wed May 4 18:52:43 2022, Tega, Update, BHD, POP beam too high at POP SM4 on the ITMX chamber
|
Thu May 5 14:46:22 2022, Anchal, Update, BHD, POP beam height lowered, POP_SM4 raised
|
Thu May 5 17:05:31 2022, Tega, Update, BHD, IMC & X/Y-arm alignment
|
Mon May 9 18:43:03 2022, Anchal, Update, BHD, ITMX table layout corrected
|
Mon May 9 18:49:05 2022, Tega, Update, BHD, Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table 
|
Tue May 10 15:46:38 2022, JC, Update, BHD, Relocate green TRX and TRY components from PSL table to BS table 
|
Tue May 10 18:25:43 2022, Paco, Update, BHD, Green Transmission path
|
Tue May 10 16:31:14 2022, Tega, Update, BHD, ITMX optlev return beam steered to QPD
|
Fri May 6 13:48:34 2022, Anchal, Update, BHD, WFS loop instability fixed
|
Thu May 12 19:55:01 2022, Tega, Update, BHD, AS path alignment 
|
Thu May 12 20:11:18 2022, Anchal, Update, BHD, BHDBS Output beams steered out to ITMY table
|
Thu May 12 20:24:29 2022, yuta, Update, BHD, POX and POY investigation
|
Mon May 16 13:22:59 2022, yuta, Update, BHD, REFL and AS paths aligned at AP table 
|
Mon May 16 19:14:17 2022, Anchal, Update, BHD, Camera set on AS path and BHDBS output path
|
Tue May 17 18:43:38 2022, Anchal, Update, BHD, Placed SRM in ITMY Chamber
|
Wed May 18 08:30:29 2022, Paco, Update, BHD, SRM OpLev
|
Thu May 19 08:51:40 2022, Paco, Update, BHD, SRM OpLev
|
Wed May 18 09:02:52 2022, Anchal, Update, BHD, WFS1 PD centered
|
Wed May 18 17:23:15 2022, Anchal, Update, BHD, Placed PRM in BS Chamber
|
Thu May 19 18:56:08 2022, yuta, Update, BHD, Current OSEM sensor values with all the suspensions aligned
|
Thu May 19 19:05:59 2022, Anchal, Update, BHD, BS Chamber all work finished, BHD path setup
|
Fri May 20 20:03:48 2022, Paco, Update, BHD, ITMY chamber work finished - LO and AS overlapped 
|
Mon May 23 13:16:59 2022, Paco, Update, BHD, End of vent - checks  
|
Tue May 24 15:21:13 2022, Anchal, Update, BHD, Freeswing tests of new SOS started
|
|
Message ID: 16860
Entry time: Tue May 17 18:43:38 2022
In reply to: 16859
Reply to this: 16861
16862
16863
|
Author: |
Anchal |
Type: |
Update |
Category: |
BHD |
Subject: |
Placed SRM in ITMY Chamber |
|
|
[Anchal, Paco, Yuta]
SRM Placement
- SRM was moved from its parked location to the nominal position in the ITMY chamber.
- This imbalanced the table a lot as all SOS towers ended up on the south side of the table.
- I needed additionally three SOS tower side walls to recover the balance of the table.
- I initially tried to use a level meter on my phone which claimed to have 0.1 degrees of accuracy. But it turned out to be a bad idea.
- Eventually, I used the spirit bubble level meter we have, along with the OSEM values of ITMY, AS1, and AS4.
- At the end, the table is balanced as it was before, all SOS are damping usually.
SRM Sat Amp Box setup
- SRM Gold Box Sat Amp was found near the BS chamber.
- This box was moved to the ITMY chamber.
- The new flange on the East end was marked earlier for SRM. This flange on the vacuum side was connected with new in-vacuum blue ribbon cables.
- We had previously moved the cable post for SRM (40m/16849) behind AS2. This cable post is connected to the old in-vacuum cable.
- It would have changed the table balance to remove this cable post and connect new in-vacuum cables to it, so we decided to do this in the next vent when we put the BHD board on the table.
- For now, we connected the old in-vacuum cable to the new in-vacuum blue ribbon cables inside.
- Note, that the old in-vacuum cable has a gender flipping section which also mirrors the pin layout.
- We installed pin mirroring cables on the outside between the Sat Amp Box and the vacuum flange to revert back the additional mirroring.
- However it happened, now the Sat Amp Box is working, with all OSEMs and coils alive.
- One peculiarity we found was that the SRM face OSEMs have only about 250-300 um of range, which is roughly 3 times less than the other OSEMs in other SOSs.
- SRM side OSEM however behaves normally.
- After installment, at the free-hanging state, SRM LL OSEM is saturated (too bright) and other face OSEMs are close to total brightness state.
- We'll first put the alignment offsets to get the SRM perpendicular to the beam coming from SR2 and then center the OSEMs in this tiny range.
- The low OSEM range could be due to improper biasing from the Sat Amp Box. Hopefully, with new electronics, this issue would go away in future.
|