40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
|
Wed May 4 13:09:42 2022, Anchal, Update, BHD, IMC table balanced again, IMC is locking, YARM is locking
|
Wed May 4 15:08:59 2022, Tega, Update, BHD, XARM alignment to get flashing
|
Wed May 4 18:52:43 2022, Tega, Update, BHD, POP beam too high at POP SM4 on the ITMX chamber
|
Thu May 5 14:46:22 2022, Anchal, Update, BHD, POP beam height lowered, POP_SM4 raised
|
Thu May 5 17:05:31 2022, Tega, Update, BHD, IMC & X/Y-arm alignment
|
Mon May 9 18:43:03 2022, Anchal, Update, BHD, ITMX table layout corrected
|
Mon May 9 18:49:05 2022, Tega, Update, BHD, Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table 
|
Tue May 10 15:46:38 2022, JC, Update, BHD, Relocate green TRX and TRY components from PSL table to BS table 
|
Tue May 10 18:25:43 2022, Paco, Update, BHD, Green Transmission path
|
Tue May 10 16:31:14 2022, Tega, Update, BHD, ITMX optlev return beam steered to QPD
|
Fri May 6 13:48:34 2022, Anchal, Update, BHD, WFS loop instability fixed
|
Thu May 12 19:55:01 2022, Tega, Update, BHD, AS path alignment 
|
Thu May 12 20:11:18 2022, Anchal, Update, BHD, BHDBS Output beams steered out to ITMY table
|
Thu May 12 20:24:29 2022, yuta, Update, BHD, POX and POY investigation
|
Mon May 16 13:22:59 2022, yuta, Update, BHD, REFL and AS paths aligned at AP table 
|
Mon May 16 19:14:17 2022, Anchal, Update, BHD, Camera set on AS path and BHDBS output path
|
Tue May 17 18:43:38 2022, Anchal, Update, BHD, Placed SRM in ITMY Chamber
|
Wed May 18 08:30:29 2022, Paco, Update, BHD, SRM OpLev
|
Thu May 19 08:51:40 2022, Paco, Update, BHD, SRM OpLev
|
Wed May 18 09:02:52 2022, Anchal, Update, BHD, WFS1 PD centered
|
Wed May 18 17:23:15 2022, Anchal, Update, BHD, Placed PRM in BS Chamber
|
Thu May 19 18:56:08 2022, yuta, Update, BHD, Current OSEM sensor values with all the suspensions aligned
|
Thu May 19 19:05:59 2022, Anchal, Update, BHD, BS Chamber all work finished, BHD path setup
|
Fri May 20 20:03:48 2022, Paco, Update, BHD, ITMY chamber work finished - LO and AS overlapped 
|
Mon May 23 13:16:59 2022, Paco, Update, BHD, End of vent - checks  
|
Tue May 24 15:21:13 2022, Anchal, Update, BHD, Freeswing tests of new SOS started
|
|
Message ID: 16849
Entry time: Thu May 12 20:11:18 2022
In reply to: 16848
Reply to this: 16850
|
Author: |
Anchal |
Type: |
Update |
Category: |
BHD |
Subject: |
BHDBS Output beams steered out to ITMY table |
|
|
I successfully steered out the two output beams from BHD BS to ITMY table today. This required significant changes on the table, but I was able to bring back the table to balance coarsely and then recover YARM flashing with fine tuning of ITMY.
- The counterweights were kept at the North end of the table which was in way of one of the output beams of BHD.
- So I saved the level meter positions in my head and removed those counterweights.
- I also needed to remove the cable post for ITMY and SRM that was in the center of the table.
- I installed a new cable post which is just for SRM and is behind AS2. ITMY's cable post is next to it on the other edge of the table. This is to ensure that BHD board can come in later without disturbing existing layout.
- I got 3 Y1-45P and 1 Y1-0 mirror. The Y1-0 mirror was not installed on a mount, so I removed an older optic which was unlabeled and put this on it's mount.
- Note that I noticed that some light (significant enough to be visible on my card) is leaking out of the 45P mirrors. We need to make sure we aren't loosing too much power due to this.
- Both beams are steered through the center of the window, they are separating outside and not clipping on any of the existing optics outside. (See attachment 1, the red beam in the center is the ITMY oplev input beam and the two IR beams are the outputs from BHD BS).
- Also note that I didn't find any LO beam while doing this work. I only used AS beam to align the path.
- I centered the ITMY oplev at the end.
Next steps:
- LO path needs to be tuned up and cleared off again. We need to match the beams on BHD BS as well.
- Setup steering mirrors and photodiodes on the outside table on ITMY.
|
|
|