Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
|
Wed May 4 13:09:42 2022, Anchal, Update, BHD, IMC table balanced again, IMC is locking, YARM is locking
|
Wed May 4 15:08:59 2022, Tega, Update, BHD, XARM alignment to get flashing
|
Wed May 4 18:52:43 2022, Tega, Update, BHD, POP beam too high at POP SM4 on the ITMX chamber
|
Thu May 5 14:46:22 2022, Anchal, Update, BHD, POP beam height lowered, POP_SM4 raised
|
Thu May 5 17:05:31 2022, Tega, Update, BHD, IMC & X/Y-arm alignment
|
Mon May 9 18:43:03 2022, Anchal, Update, BHD, ITMX table layout corrected
|
Mon May 9 18:49:05 2022, Tega, Update, BHD, Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table 
|
Tue May 10 15:46:38 2022, JC, Update, BHD, Relocate green TRX and TRY components from PSL table to BS table 
|
Tue May 10 18:25:43 2022, Paco, Update, BHD, Green Transmission path
|
Tue May 10 16:31:14 2022, Tega, Update, BHD, ITMX optlev return beam steered to QPD
|
Fri May 6 13:48:34 2022, Anchal, Update, BHD, WFS loop instability fixed
|
Thu May 12 19:55:01 2022, Tega, Update, BHD, AS path alignment 
|
Thu May 12 20:11:18 2022, Anchal, Update, BHD, BHDBS Output beams steered out to ITMY table
|
Thu May 12 20:24:29 2022, yuta, Update, BHD, POX and POY investigation
|
Mon May 16 13:22:59 2022, yuta, Update, BHD, REFL and AS paths aligned at AP table 
|
Mon May 16 19:14:17 2022, Anchal, Update, BHD, Camera set on AS path and BHDBS output path
|
Tue May 17 18:43:38 2022, Anchal, Update, BHD, Placed SRM in ITMY Chamber
|
Wed May 18 08:30:29 2022, Paco, Update, BHD, SRM OpLev
|
Thu May 19 08:51:40 2022, Paco, Update, BHD, SRM OpLev
|
Wed May 18 09:02:52 2022, Anchal, Update, BHD, WFS1 PD centered
|
Wed May 18 17:23:15 2022, Anchal, Update, BHD, Placed PRM in BS Chamber
|
Thu May 19 18:56:08 2022, yuta, Update, BHD, Current OSEM sensor values with all the suspensions aligned
|
Thu May 19 19:05:59 2022, Anchal, Update, BHD, BS Chamber all work finished, BHD path setup
|
Fri May 20 20:03:48 2022, Paco, Update, BHD, ITMY chamber work finished - LO and AS overlapped 
|
Mon May 23 13:16:59 2022, Paco, Update, BHD, End of vent - checks  
|
Tue May 24 15:21:13 2022, Anchal, Update, BHD, Freeswing tests of new SOS started
|
|
Message ID: 16838
Entry time: Mon May 9 18:49:05 2022
In reply to: 16837
Reply to this: 16842
|
Author: |
Tega |
Type: |
Update |
Category: |
BHD |
Subject: |
Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table |
|
|
[Paco, Tega]
Started work on the relocating the green transmission optics, cameras and PDs. Before removing the any of the optics, we checked and confirmed that the PDs and Cams are indeed connected to the GRN TRX/Y medm channels. Then added labels to the cables before moving them.
Plumbing:
- Moved all power and signal cables for the PDs and cameras from PSL table to BS table. See attachment #1
Relocated Optics & PDs & Cameras:
- TRX and TRY cameras
- TRX and TRY PDs
- 1 BS, 2 lens for PDs and a steering mirror, see Atachement #2
|
|
|
|
|