40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Wed Sep 29 17:10:09 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Thu Sep 30 14:09:37 2021, Anchal, Summary, CDS, New way to ssh into c1teststand
|
Thu Mar 3 15:37:40 2022, Anchal, Summary, CDS, c1teststand restructured
|
Mon Oct 4 11:05:44 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Mon Oct 4 18:00:16 2021, Koji, Summary, CDS, c1teststand problems summary
|
Tue Oct 5 17:58:52 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Tue Oct 5 18:00:53 2021, Anchal, Summary, CDS, c1teststand time synchronization working now
|
Mon Oct 11 17:31:25 2021, Anchal, Summary, CDS, Fixed mounting of mx devices in fb. daqd_dc is running now.
|
Mon Oct 11 18:29:35 2021, Anchal, Summary, CDS, Moving forward?
|
Tue Oct 12 17:20:12 2021, Anchal, Summary, CDS, Connected c1sus2 to martian network
|
Tue Oct 12 23:42:56 2021, Koji, Summary, CDS, Connected c1sus2 to martian network
|
Wed Oct 13 11:25:14 2021, Anchal, Summary, CDS, Ran c1sus2 models in martian CDS. All good!
|
Tue Oct 19 18:20:33 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test 
|
Tue Oct 19 23:43:09 2021, Koji, Summary, CDS, c1sus2 DAC to ADC test   
|
Wed Oct 20 11:48:27 2021, Anchal, Summary, CDS, Power supple configured correctly.
|
Tue Oct 26 18:24:00 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test 
|
Wed Dec 22 17:40:22 2021, Anchal, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs
|
Wed Dec 29 20:09:40 2021, rana, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs
|
Fri Mar 4 11:04:34 2022, Anchal, Summary, CDS, c1susaux2 system setup and running
|
Mon Mar 7 19:38:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls issues
|
Mon Mar 14 12:20:05 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis installed 
|
Thu Mar 17 19:12:44 2022, Anchal, Summary, CDS, c1auxey1 slow controls acromag chassis installed, not powered
|
Fri Mar 18 18:39:13 2022, Yehonathan, Summary, CDS, c1auxey1 slow controls acromag chassis installed, powered
|
Fri Mar 18 19:10:51 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues
|
Mon Mar 21 18:42:06 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues
|
Mon Apr 4 17:03:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis fixed and installed
|
Wed Jul 6 22:40:03 2022, Tega, Summary, CDS, Use osem variance to turn off SUS damping instead of coil outputs
|
Thu Jul 7 21:25:48 2022, Tega, Summary, CDS, Use osem variance to turn off SUS damping instead of coil outputs
|
Tue Mar 15 11:52:34 2022, Anchal, Summary, CDS, c1su2 model updated for sending Run/Acquire Binary Output to Binary Interface card
|
Tue Mar 15 14:10:41 2022, Anchal, Summary, CDS, c1su2 model remade, reinstalled, restarted after the update
|
Tue Oct 12 17:10:56 2021, Anchal, Summary, CDS, Some more information
|
|
Message ID: 16741
Entry time: Mon Mar 21 18:42:06 2022
In reply to: 16737
|
Author: |
Anchal |
Type: |
Summary |
Category: |
CDS |
Subject: |
c1auxey1 slow controls issues |
|
|
Another issue, Green Y Shutter can not be controlled with the EPICS controls right now. This needs to be investigated. |