Wed Sep 29 17:10:09 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Thu Sep 30 14:09:37 2021, Anchal, Summary, CDS, New way to ssh into c1teststand
|
Thu Mar 3 15:37:40 2022, Anchal, Summary, CDS, c1teststand restructured
|
Mon Oct 4 11:05:44 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Mon Oct 4 18:00:16 2021, Koji, Summary, CDS, c1teststand problems summary
|
Tue Oct 5 17:58:52 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Tue Oct 5 18:00:53 2021, Anchal, Summary, CDS, c1teststand time synchronization working now
|
Mon Oct 11 17:31:25 2021, Anchal, Summary, CDS, Fixed mounting of mx devices in fb. daqd_dc is running now.
|
Mon Oct 11 18:29:35 2021, Anchal, Summary, CDS, Moving forward?
|
Tue Oct 12 17:20:12 2021, Anchal, Summary, CDS, Connected c1sus2 to martian network
|
Tue Oct 12 23:42:56 2021, Koji, Summary, CDS, Connected c1sus2 to martian network
|
Wed Oct 13 11:25:14 2021, Anchal, Summary, CDS, Ran c1sus2 models in martian CDS. All good!
|
Tue Oct 19 18:20:33 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test 
|
Tue Oct 19 23:43:09 2021, Koji, Summary, CDS, c1sus2 DAC to ADC test   
|
Wed Oct 20 11:48:27 2021, Anchal, Summary, CDS, Power supple configured correctly.
|
Tue Oct 26 18:24:00 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test 
|
Wed Dec 22 17:40:22 2021, Anchal, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs
|
Wed Dec 29 20:09:40 2021, rana, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs
|
Fri Mar 4 11:04:34 2022, Anchal, Summary, CDS, c1susaux2 system setup and running
|
Mon Mar 7 19:38:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls issues
|
Mon Mar 14 12:20:05 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis installed 
|
Thu Mar 17 19:12:44 2022, Anchal, Summary, CDS, c1auxey1 slow controls acromag chassis installed, not powered
|
Fri Mar 18 18:39:13 2022, Yehonathan, Summary, CDS, c1auxey1 slow controls acromag chassis installed, powered
|
Fri Mar 18 19:10:51 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues
|
Mon Mar 21 18:42:06 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues
|
Mon Apr 4 17:03:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis fixed and installed
|
Wed Jul 6 22:40:03 2022, Tega, Summary, CDS, Use osem variance to turn off SUS damping instead of coil outputs
|
Thu Jul 7 21:25:48 2022, Tega, Summary, CDS, Use osem variance to turn off SUS damping instead of coil outputs
|
Tue Mar 15 11:52:34 2022, Anchal, Summary, CDS, c1su2 model updated for sending Run/Acquire Binary Output to Binary Interface card
|
Tue Mar 15 14:10:41 2022, Anchal, Summary, CDS, c1su2 model remade, reinstalled, restarted after the update
|
Tue Oct 12 17:10:56 2021, Anchal, Summary, CDS, Some more information
|
|
Message ID: 16737
Entry time: Fri Mar 18 19:10:51 2022
In reply to: 16736
Reply to this: 16741
|
Author: |
Anchal |
Type: |
Summary |
Category: |
CDS |
Subject: |
c1auxey1 slow controls issues |
|
|
I started the modbusIOC service on c1auxey1 and added PD variance channels for UR and SD as well. There are unfortunately two issues here:
- The enable monitors are reading NOT of what they should read. The optical isolator circuit might need to be changed.
- ETMY is not damping now. This is strange and was seen in the use to other acromag chassis as well where AS4 and PR2 are unable to damp. This is weird since the acromag chassis are not part of the damping loop, maybe it is a coincidence. Next time we should check if we still have this issue when acromag chassis is disconnected from ETMY.
|