40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Wed Sep 29 17:10:09 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Thu Sep 30 14:09:37 2021, Anchal, Summary, CDS, New way to ssh into c1teststand
|
Thu Mar 3 15:37:40 2022, Anchal, Summary, CDS, c1teststand restructured
|
Mon Oct 4 11:05:44 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Mon Oct 4 18:00:16 2021, Koji, Summary, CDS, c1teststand problems summary
|
Tue Oct 5 17:58:52 2021, Anchal, Summary, CDS, c1teststand problems summary
|
Tue Oct 5 18:00:53 2021, Anchal, Summary, CDS, c1teststand time synchronization working now
|
Mon Oct 11 17:31:25 2021, Anchal, Summary, CDS, Fixed mounting of mx devices in fb. daqd_dc is running now.
|
Mon Oct 11 18:29:35 2021, Anchal, Summary, CDS, Moving forward?
|
Tue Oct 12 17:20:12 2021, Anchal, Summary, CDS, Connected c1sus2 to martian network
|
Tue Oct 12 23:42:56 2021, Koji, Summary, CDS, Connected c1sus2 to martian network
|
Wed Oct 13 11:25:14 2021, Anchal, Summary, CDS, Ran c1sus2 models in martian CDS. All good!
|
Tue Oct 19 18:20:33 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test 
|
Tue Oct 19 23:43:09 2021, Koji, Summary, CDS, c1sus2 DAC to ADC test   
|
Wed Oct 20 11:48:27 2021, Anchal, Summary, CDS, Power supple configured correctly.
|
Tue Oct 26 18:24:00 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test 
|
Wed Dec 22 17:40:22 2021, Anchal, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs
|
Wed Dec 29 20:09:40 2021, rana, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs
|
Fri Mar 4 11:04:34 2022, Anchal, Summary, CDS, c1susaux2 system setup and running
|
Mon Mar 7 19:38:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls issues
|
Mon Mar 14 12:20:05 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis installed 
|
Thu Mar 17 19:12:44 2022, Anchal, Summary, CDS, c1auxey1 slow controls acromag chassis installed, not powered
|
Fri Mar 18 18:39:13 2022, Yehonathan, Summary, CDS, c1auxey1 slow controls acromag chassis installed, powered
|
Fri Mar 18 19:10:51 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues
|
Mon Mar 21 18:42:06 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues
|
Mon Apr 4 17:03:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis fixed and installed
|
Wed Jul 6 22:40:03 2022, Tega, Summary, CDS, Use osem variance to turn off SUS damping instead of coil outputs
|
Thu Jul 7 21:25:48 2022, Tega, Summary, CDS, Use osem variance to turn off SUS damping instead of coil outputs
|
Tue Mar 15 11:52:34 2022, Anchal, Summary, CDS, c1su2 model updated for sending Run/Acquire Binary Output to Binary Interface card
|
Tue Mar 15 14:10:41 2022, Anchal, Summary, CDS, c1su2 model remade, reinstalled, restarted after the update
|
Tue Oct 12 17:10:56 2021, Anchal, Summary, CDS, Some more information
|
|
Message ID: 16726
Entry time: Tue Mar 15 11:52:34 2022
In reply to: 16533
Reply to this: 16728
|
Author: |
Anchal |
Type: |
Summary |
Category: |
CDS |
Subject: |
c1su2 model updated for sending Run/Acquire Binary Output to Binary Interface card |
|
|
I routed the XXX_COIL_DW signals from the 7 SOS blocks in c1su2.mdl (located at /cvs/cds/rtcds/userapps/trunk/sus/c1/models/c1su2.mdl) to the binary outputs from the FE model. The routing is done such that when these binary outputs are routed through the binary interface card mounted on 1Y0, they go to the acromag chassis just installed and from there they go to the binary inputs of the coil drivers together with the acromag controlled coil outputs.
I have not restarted the rtcds models yet. This needs more care and need to follow instructions from 40m/16533. Will do that sometime later or Koji can follow up this work. |
|
|