40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Tue Feb 1 15:33:28 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics
|
Wed Feb 2 18:55:58 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics
|
Wed Feb 2 21:16:23 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics
|
Thu Apr 28 11:53:10 2022, Anchal, Summary, BHD, POP_SM4 and POP_SM5 Assembly
|
Tue May 3 14:02:09 2022, Anchal, Summary, BHD, Installed POP path in ITMX Chamber
|
Thu Apr 14 10:18:35 2022, Paco, Summary, BHD, 2 in oplev mirrors incompatible with LMR2V
|
Thu Apr 14 18:34:51 2022, Paco, Summary, BHD, ITMY Oplev reinstalled (Re: 2 in oplev mirrors incompatible with LMR2V)
|
|
Message ID: 16641
Entry time: Wed Feb 2 21:16:23 2022
In reply to: 16640
|
Author: |
Koji |
Type: |
Summary |
Category: |
BHD |
Subject: |
Optomechanics configuration for the in-vacuum aux small optics |
|
|
Asked Jordan to clean 2x 1.5" posts (0.5 dia) and a washer with 1" dia.
|
|
|