Thu Dec 16 15:04:12 2021, Chub, Update, Electronics, ITMX feedthroughs and in-vac cables installed
|
Thu Dec 16 15:54:08 2021, Koji, Update, Electronics, ITMX feedthroughs and in-vac cables installed
|
Mon Jan 10 15:45:55 2022, Paco, Update, Electronics, ITMY feedthroughs and in-vac cables installed - part I
|
Tue Jan 11 10:23:18 2022, Paco, Update, Electronics, ITMY feedthroughs and in-vac cables installed - part II
|
Tue Jan 11 14:21:53 2022, Paco, Update, Electronics, BS feedthroughs and in-vac cables installed
|
Fri Jan 14 12:01:21 2022, Anchal, Update, Electronics, BS & ITMY feedthroughs labeled and connected to Sat Amps
|
|
Message ID: 16586
Entry time: Fri Jan 14 12:01:21 2022
In reply to: 16574
|
Author: |
Anchal |
Type: |
Update |
Category: |
Electronics |
Subject: |
BS & ITMY feedthroughs labeled and connected to Sat Amps |
|
|
I labeled all the newly installed flanges and connected the in-air cables (40m/16530) to appropriate ports. These cables are connected to the CDS system on 1Y1/1Y0 racks through the satellite amplifiers. So all new optics now can be damped as soon as they are placed. We need to make more DB9 plugs for setting "Acquire" mode on the HAM-A coil drivers since our Binary input system is not ready yet. Right now, we only have 2 such plugs which means only one optic and be damped at a time.
|