Fri Dec 17 12:32:35 2021, Koji, Update, SUS, Remaining task for 2021
|
Fri Dec 17 19:19:42 2021, Koji, Update, SUS, Remaining task for 2021
|
Sun Dec 19 07:52:51 2021, Anchal, Update, SUS, Remaining task for 2021
|
Wed Dec 22 18:16:23 2021, Koji, Update, SUS, Remaining task for 2021 
|
|
Message ID: 16534
Entry time: Wed Dec 22 18:16:23 2021
In reply to: 16519
|
Author: |
Koji |
Type: |
Update |
Category: |
SUS |
Subject: |
Remaining task for 2021 |
|
|
The in-vacuum installation team has reported that the side OSEMs of ITMX and LO1 are going to be interfering if place LO1 at the planned location.
I confirmed that ITMX has the side magnet on the other side (Attachment 1 ITMX photo taken on 2016/7/21). So we can do this swap.
The ITMX side OSEM is sticking out most. By doing this operation, we will recover most of the space between the ITMX and LO1. (Attachment 2) |
|
|
|
|