Fri Oct 29 14:39:37 2021, Anchal, Summary, BHD, 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE.  
|
Tue Nov 2 16:42:00 2021, Paco, Summary, BHD, 1Y1 rack work
|
Tue Nov 2 18:54:41 2021, Anchal, Paco, Update, BHD, Optical fibres laid for BHD upgrade
|
Thu Nov 4 15:03:43 2021, Koji, Summary, BHD, 1Y1 rack work
|
Mon Nov 8 10:13:52 2021, Paco, Summary, BHD, 1Y1 rack work; Sorensens removed
|
Mon Nov 8 13:13:00 2021, Koji, Summary, BHD, 1Y1 rack work; Sorensens removed
|
Mon Nov 8 15:29:05 2021, Paco, Summary, BHD, 1Y1 rack work; New power for cameras
|
Mon Nov 8 18:42:38 2021, Koji, Summary, BHD, Rack Layout / Power Strips
|
Tue Nov 9 19:02:47 2021, Anchal, Summary, BHD, 1Y0 Populated and 1Y1,1Y0 powered
|
|
Message ID: 16454
Entry time: Mon Nov 8 13:13:00 2021
In reply to: 16453
Reply to this: 16455
|
Author: |
Koji |
Type: |
Summary |
Category: |
BHD |
Subject: |
1Y1 rack work; Sorensens removed |
|
|
Updated the rack layout. Now there is an issue.
We were supposed to have 1U space at the top, but it was occupied by the 12V.
We need to either lower the c1sus2 and IO chassis 1U or move the Sorensen at the bottom. |
|
|