Fri Oct 29 14:39:37 2021, Anchal, Summary, BHD, 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE.  
|
Tue Nov 2 16:42:00 2021, Paco, Summary, BHD, 1Y1 rack work
|
Tue Nov 2 18:54:41 2021, Anchal, Paco, Update, BHD, Optical fibres laid for BHD upgrade
|
Thu Nov 4 15:03:43 2021, Koji, Summary, BHD, 1Y1 rack work
|
Mon Nov 8 10:13:52 2021, Paco, Summary, BHD, 1Y1 rack work; Sorensens removed
|
Mon Nov 8 13:13:00 2021, Koji, Summary, BHD, 1Y1 rack work; Sorensens removed
|
Mon Nov 8 15:29:05 2021, Paco, Summary, BHD, 1Y1 rack work; New power for cameras
|
Mon Nov 8 18:42:38 2021, Koji, Summary, BHD, Rack Layout / Power Strips
|
Tue Nov 9 19:02:47 2021, Anchal, Summary, BHD, 1Y0 Populated and 1Y1,1Y0 powered
|
|
Message ID: 16445
Entry time: Tue Nov 2 18:54:41 2021
In reply to: 16444
|
Author: |
Anchal, Paco |
Type: |
Update |
Category: |
BHD |
Subject: |
Optical fibres laid for BHD upgrade |
|
|
We successfully laid down all required optical fibre fiber cables from 1X4-1X7 region to 1Y1-1Y3 region today. This includes following cables:
- Timing
fibre fiber from Master Timing Synchornizer D050239 on 1X6 to C1SU2 I/O chassis on 1Y1.
- Timing
fibre fiber from Master Timing Synchornizer D050239 on 1X6 to C1BHD I/O chassis on 1Y3.
- CX4 cable from Dolphin Card on 1X4 to C1SU2 FE on 1Y1 for IPC.
- CX4 cable from Dolphin Card on 1X4 to C1BHD FE on 1Y3 for IPC.
- DAQ Network extension
fibre fiber optic cable from DAQ Network Switch on 1X7 to another switch we mounted on 1Y3 for local DAQ network distribution.
|