40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Fri Mar 19 19:15:13 2021, Jon, Update, CDS, c1auxey assembly
|
Thu Mar 25 12:11:53 2021, Yehonathan, Update, CDS, c1auxey assembly 
|
Thu Mar 25 14:16:33 2021, gautam, Update, CDS, c1auxey assembly
|
Tue Mar 30 17:27:04 2021, Yehonathan, Update, CDS, c1auxey assembly
|
Wed Aug 25 11:48:48 2021, Yehonathan, Update, CDS, c1auxey assembly
|
Mon Sep 13 14:32:25 2021, Yehonathan, Update, CDS, c1auxey assembly
|
Wed Sep 15 11:27:50 2021, Yehonathan, Update, CDS, c1auxey assembly 
|
Thu Apr 15 17:24:08 2021, Jon, Update, CDS, Updated c1auxey wiring plan
|
Mon Apr 19 21:54:55 2021, Yehonathan, Update, CDS, Updated c1auxey wiring plan
|
Wed Apr 28 18:56:57 2021, Yehonathan, Jon, Update, CDS, Updated c1auxey wiring plan
|
Thu Apr 29 16:35:51 2021, Yehonathan, Update, CDS, Updated c1auxey wiring plan
|
Thu Apr 29 19:55:45 2021, Yehonathan, Update, CDS, Updated c1auxey wiring plan
|
Fri Apr 30 19:18:51 2021, Yehonathan, Jon, Update, CDS, Updated c1auxey wiring plan
|
Mon May 3 20:36:46 2021, Yehonathan, Jon, Update, CDS, Updated c1auxey wiring plan
|
Sun May 23 18:28:54 2021, Jon, Update, CDS, Opto-isolator for c1auxey
|
Fri May 28 10:54:59 2021, Jon, Update, CDS, Opto-isolator for c1auxey
|
Thu Jun 3 17:15:17 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey 
|
Thu Jun 3 22:08:00 2021, Koji, Update, CDS, Opto-isolator for c1auxey
|
Fri Jun 4 14:49:23 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey
|
Fri Jun 4 17:46:25 2021, unYehonathan, Update, CDS, Opto-isolator for c1auxey
|
Sun Jun 6 16:33:47 2021, Jon, Update, CDS, BI channels on c1auxey
|
Mon Jun 7 13:14:20 2021, Yehonathan, Update, CDS, BI channels on c1auxey
|
Tue Jun 8 11:54:39 2021, Yehonathan, Update, CDS, BI channels on c1auxey
|
Sun Jun 6 03:02:14 2021, Koji, Update, CDS, Opto-isolator for c1auxey
|
Sun Jun 6 12:15:16 2021, Jon, Update, CDS, Opto-isolator for c1auxey
|
Sun Jun 6 15:59:51 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey
|
Mon Jun 14 15:31:30 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey
|
Tue Jun 15 21:48:55 2021, Koji, Update, CDS, Opto-isolator for c1auxey
|
Wed Jun 16 17:24:29 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey
|
Wed Jun 16 20:32:39 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey
|
Fri Jul 9 18:35:32 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey
|
Mon Jul 12 18:06:25 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey
|
Wed Jul 28 12:47:52 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey  
|
Wed Aug 11 12:06:40 2021, Yehonathan, Update, CDS, Opto-isolator for c1auxey
|
|
Message ID: 16037
Entry time: Thu Apr 15 17:24:08 2021
In reply to: 15962
Reply to this: 16052
|
Author: |
Jon |
Type: |
Update |
Category: |
CDS |
Subject: |
Updated c1auxey wiring plan |
|
|
I've updated the c1auxey wiring plan for compatibility with the new suspension electronics. Specifically it is based on wiring schematics for the new HAM-A coil driver (D1100117), satellite amplifier (D1002818), and HV bias driver (D1900163).
Changes:
- The PDMon, VMon, CoilEnable, and BiasAdj channels all move from DB37 to various DB9 breakout boards.
- The DB9 cables (x2) connecting the CoilEnable channels to the coil drivers must be spliced with the dewhitening switching signals from the RTS.
- As suggested, I added five new BI channels to monitor the state of the CoilEnable switches. For lack of a better name, they follow the naming convention
C1:SUS-ETMY_xx_ENABLEMon .
@Yehonathan can proceed with wiring the chassis.
Quote: |
I finished prewiring the new c1auxey Acromag chassis (see attached pictures). I connected all grounds to the DIN rail to save some wiring. The power switches and LEDs work as expected.
I configured the DAQ modules using the old windows machine. I configured the gateway to be 192.168.114.1. The host machine still needs to be setup.
Next, the feedthroughs need to be wired and the channels need to be bench tested.
|
|
|