40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Apr 7 22:48:48 2021, gautam, Update, IOO, Waveplate commissioning remotePowCtrl.pdf
    Reply  Tue Apr 13 17:47:07 2021, gautam, Update, IOO, Waveplate commissioning - software prepared remoteHWP.png
       Reply  Thu Apr 15 15:54:46 2021, gautam, Update, IOO, Waveplate commissioning - hardware installed 
Message ID: 16036     Entry time: Thu Apr 15 15:54:46 2021     In reply to: 16022
Author: gautam 
Type: Update 
Category: IOO 
Subject: Waveplate commissioning - hardware installed 

[jordan, gautam]

We did the following this afternoon.

  1. Disconnected the cable from the unused (and possibly not working) RefCav heater power supply, and removed said PS from 1X1. There was insufficient space to install the ESP300 controller elsewhere. I have stored the power supply along the east arm under the beamtube, approximately directly opposite the RFPD cabinet.
  2. Installed the ESP 300 - conveniently, the HP DCPS was already sitting on some rails and so we didn't need to add any.
  3. Ran a long D25-D25 cable from the ESP300 to the NE corner area of the PSL enclosure. The ends of the cable are labelled as "ESP end" and "Waveplate end". The HEPA was turned on for the duration we had the enclosure open, and I have now turned it off.
  4. Connected the waveplate to this cable. Also re-connected the ESP300 to the c1psl supermicro host via the USB-RS232 adapter cable.

The IMC stayed locked throughout our work, and judging by the CDS overview screen, we don't seem to have done any lasting damage, but I will run more tests. Note that the waveplate isn't yet installed in the beam path - I may do this later today evening depending on lab activity, but for now, it is just sitting on the lower shelf inside the PSL enclosure. I will post some photos later.

Quote:
 

So this system is ready to be installed once Jordan and I find some time to lay out cabling + install the ESP300 controller in a rack.


Update: The waveplate was installed. I gave it a couple of rounds of cleaning by first contact, and visually, it looked good to me. More photos uploaded. I also made some minor improvements to the MEDM screen, and setup the communication script with the ESP300 to run as a systemd service on c1psl. Let's see how stable things are... I think the philosophy at the sites is to calibrate the waveplate rotation angle in terms of power units, but i'm not sure how the unit we have performs in terms of backlash error. We can do a trial by requesting ~100 "random" angles, monitoring the power in s- and p-polatizations, and then quanitfying the error between requested and realized angles, but I haven't done this yet. I also haven't added these channels to the set recorded to frames / to the burt snapshot - do we want to record these channels long term?