40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Wed Feb 24 22:13:47 2021, Jon, Update, CDS, Planning document for front-end testing
|
Fri Mar 5 17:48:25 2021, Jon, Update, CDS, Front-end testing  
|
Tue Mar 9 16:52:47 2021, Jon, Update, CDS, Front-end testing
|
Tue Mar 16 16:27:22 2021, Jon, Update, CDS, Front-end testing
|
Tue Mar 16 19:04:20 2021, gautam, Update, CDS, Front-end testing
|
Fri Mar 19 18:14:56 2021, Jon, Update, CDS, Front-end testing 
|
Wed Mar 24 19:02:21 2021, Jon, Update, CDS, Front-end testing
|
Mon Mar 29 17:55:50 2021, Jon, Update, CDS, Front-end testing
|
Tue Mar 30 18:21:34 2021, Jon, Update, CDS, Front-end testing
|
Tue Apr 6 07:19:11 2021, Jon, Update, CDS, New SimPlant cymac
|
Tue Apr 6 11:13:01 2021, Jon, Update, CDS, FE testing
|
Sat Apr 10 08:51:32 2021, Jon, Update, CDS, I/O Chassis Assembly
|
Thu Apr 29 10:51:35 2021, Jon, Update, CDS, I/O Chassis Assembly
|
Tue May 4 07:38:36 2021, Jon, Update, CDS, I/O Chassis Assembly
|
Tue May 11 16:29:55 2021, Jon, Update, CDS, I/O Chassis Assembly
|
Tue May 11 17:43:09 2021, Koji, Update, CDS, I/O Chassis Assembly
|
Fri May 28 11:16:21 2021, Jon, Update, CDS, Front-End Assembly and Testing   
|
Sun Jun 6 08:42:05 2021, Jon, Update, CDS, Front-End Assembly and Testing  
|
Tue Jun 22 16:53:01 2021, Ian MacMillan, Update, CDS, Front-End Assembly and Testing
|
Thu Jun 24 17:32:52 2021, Ian MacMillan, Update, CDS, Front-End Assembly and Testing  
|
Fri Jun 25 14:06:10 2021, Jon, Update, CDS, Front-End Assembly and Testing
|
Sat Apr 10 11:56:14 2021, Jon, Update, CDS, 40m LSC simPlant model
|
Tue Apr 13 16:24:38 2021, Ian MacMillan, Update, CDS, 40m LSC simPlant model
|
Mon Apr 19 13:15:20 2021, Ian MacMillan, Update, CDS, 40m LSC simPlant model
|
Wed Apr 21 10:03:01 2021, Ian MacMillan, Update, CDS, 40m LSC simPlant model
|
Wed Apr 21 11:01:37 2021, Rana, Update, CDS, 40m LSC simPlant model
|
Fri Apr 23 15:52:19 2021, Ian MacMillan, Update, CDS, 40m LSC simPlant model  
|
Sun Apr 25 21:21:02 2021, rana, Update, CDS, SUS simPlant model
|
Tue Apr 27 15:15:17 2021, Ian MacMillan, Update, CDS, SUS simPlant model 
|
Thu Apr 29 13:41:40 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Fri Apr 30 12:52:14 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Mon May 3 13:35:12 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Tue May 4 14:55:38 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Wed May 5 15:11:54 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Thu May 6 16:13:24 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Fri May 7 11:19:29 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Wed May 12 13:06:15 2021, Ian MacMillan, Update, CDS, SUS simPlant model   
|
Fri May 21 09:44:52 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Fri May 21 14:36:20 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Thu Jun 3 13:06:47 2021, Ian MacMillan, Update, CDS, SUS simPlant model 
|
Mon Jun 7 17:49:19 2021, Ian MacMillan, Update, CDS, SUS simPlant model 
|
Wed Jun 9 13:50:48 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
Tue Jun 15 11:46:40 2021, Ian MacMillan, Update, CDS, SUS simPlant model 
|
Wed Jun 30 14:09:26 2021, Ian MacMillan, Update, CDS, SUS simPlant model 
|
Mon Aug 23 15:25:59 2021, Ian MacMillan, Update, CDS, SUS simPlant model
|
|
Message ID: 15872
Entry time: Fri Mar 5 17:48:25 2021
In reply to: 15842
Reply to this: 15890
|
Author: |
Jon |
Type: |
Update |
Category: |
CDS |
Subject: |
Front-end testing |
|
|
Today I moved the c1bhd machine from the control room to a new test area set up behind (west of) the 1X6 rack. The test stand is pictured in Attachment 1. I assembled one of the new IO chassis and connected it to the host.
I/O Chassis Assembly
- LIGO-style 24V feedthrough replaced with an ATX 650W switching power supply
- Timing slave installed
- Contec DO-1616L-PE card installed for timing control
- One 16-bit ADC and one 32-channel DO module were installed for testing
The chassis was then powered on and LED lights illuminated indicating that all the components have power. The assembled chassis is pictured in Attachment 2.
Chassis-Host Communications Testing
Following the procedure outlined T1900700, the system failed the very first test of the communications link between chassis and host, which is to check that all PCIe cards installed in both the host and the expansion chassis are detected. The Dolpin host adapter card is detected:
07:06.0 PCI bridge: Stargen Inc. Device 0102 (rev 02) (prog-if 00 [Normal decode])
Flags: bus master, fast devsel, latency 0
Bus: primary=07, secondary=0e, subordinate=0e, sec-latency=0
I/O behind bridge: 00002000-00002fff
Prefetchable memory behind bridge: 00000000c0200000-00000000c03fffff
Capabilities: [40] Power Management version 2
Capabilities: [50] MSI: Enable- Count=1/1 Maskable- 64bit+
Capabilities: [60] Express Downstream Port (Slot+), MSI 00
Capabilities: [80] Subsystem: Device 0000:0000
Kernel driver in use: pcieport
However the OSS PCIe adapter card linking the host to the IO chassis was not detected, nor were any of the cards in the expansion chassis. Gautam previously reported that the OSS card was not detected by the host (though it was not connected to the chassis then). Even now connected to the IO chassis, the card is still not detected. On the chassis-side OSS card, there is a red LED illuminated indicating "HOST CARD RESET" as pictured in Attachment 3. This may indicate a problem with the card on the host side. Still more debugging to be done. |
|
|
|
|
|
|