40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Dec 18 22:59:12 2020, Jon, Configuration, CDS, Updated CDS upgrade plan CDS_2020_Dec.pdfCDS_2020_Dec.graffle
    Reply  Mon Dec 21 09:28:50 2020, Jamie, Configuration, CDS, Updated CDS upgrade plan 
    Reply  Wed Dec 23 23:06:45 2020, gautam, Configuration, CDS, Updated CDS upgrade plan 
       Reply  Tue Jan 19 14:05:25 2021, Jon, Configuration, CDS, Updated CDS upgrade plan 40m_CDS_Network_-_Planned.pdf40m_CDS_Network_-_Current.pdf
          Reply  Tue Jan 19 15:43:24 2021, gautam, Configuration, CDS, Updated CDS upgrade plan 
Message ID: 15772     Entry time: Tue Jan 19 15:43:24 2021     In reply to: 15771
Author: gautam 
Type: Configuration 
Category: CDS 
Subject: Updated CDS upgrade plan 

Not sure if 1Y1 can accommodate both c1sus2 and c1bhd as well as the various electronics chassis that will have to be installed. There may need to be some distribution between 1Y1 and 1Y3. Does Koji's new wiring also specify which racks hold which chassis?

Some minor improvements to the diagram:

  1. The GPS receiver in 1X7 should be added. All the timing in the lab is synced to the 1pps from this.
  2. We should add hyperlinks to the various parts datasheets (e.g. Dolphin switch, RFM switch, etc etc) so that the diagram will be truly informative and self-contained.
  3. Megatron and nodus, but especially chiara (NFS server), should be added to the diagram. 