Entry  Fri Dec 18 22:59:12 2020, Jon, Configuration, CDS, Updated CDS upgrade plan CDS_2020_Dec.pdfCDS_2020_Dec.graffle
    Reply  Mon Dec 21 09:28:50 2020, Jamie, Configuration, CDS, Updated CDS upgrade plan 
    Reply  Wed Dec 23 23:06:45 2020, gautam, Configuration, CDS, Updated CDS upgrade plan 
       Reply  Tue Jan 19 14:05:25 2021, Jon, Configuration, CDS, Updated CDS upgrade plan 40m_CDS_Network_-_Planned.pdf40m_CDS_Network_-_Current.pdf
          Reply  Tue Jan 19 15:43:24 2021, gautam, Configuration, CDS, Updated CDS upgrade plan 
Message ID: 15742     Entry time: Mon Dec 21 09:28:50 2020     In reply to: 15738
Author: Jamie 
Type: Configuration 
Category: CDS 
Subject: Updated CDS upgrade plan 
Quote:

Attached is the layout for the "intermediate" CDS upgrade option, as was discussed on Wednesday. Under this plan:

  • Existing FEs stay where they are (they are not moved to a single rack)

  • Dolphin IPC remains PCIe Gen 1

  • RFM network is entirely replaced with Dolphin IPC

Please send me any omissions or corrections to the layout.

I just want to point out that if you move all the FEs to the same rack they can all be connected to the Dolphin switch via copper, and you would only have to string a single fiber to every IO rack, rather than the multiple now (for network, dolphin, timing, etc.).