I installed 4 chassis in the rack 1X2 (characterization on the E-bench was deemed satisfactory, I will upload the analysis later). I ran out of hardware to make power cables so only 2 of them are powered right now (1 32ch AA chassis and 1 WFS head interface). The current limit on the +24V Sorensens was raised to allow for similar margin to the limit with the increased current draw.

Remaining work:

  1. Make 2 more power cables for ISC whitening chassis and quad demod chassis.
  2. Make a 2x 4pin LEMO-->DB9 cable to digitize the FSS and PMC diagnostic channels with the new AA chassis. If RnD cables has a very short turnaround time, might be worth it to give this to them as well.
  3. Connect ADC1 on c1ioo machine to new AA chassis (transfer SCSI cable from existing AA unit to the new one). This will necessarily involve some model changes as well.
  4. Make a short cable to connect 55 MHz output from RFsource box to the LO input on the quad demod chassis.
  5. Install the WFS head on the AS table at a suitable location. Probably will need a focusing lens as well. 
  6. Connect WFS head to the signal processing electronics (the cables were already laid out by Jordan and I).
  7. Make the necessary CDS model changes (WFS filters, matrices, servos etc). I personally don't see the need for a new model but if anyone feels strongly about separating the IMC WFS and AS WFS we can set up another model.
  8. Commission the system.

While I definitely bumped various cables, I don't seem to have done any lasting damage to the CDS system (the RFM errors remain of course).