40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 1574     Entry time: Mon May 11 12:25:03 2009
Author: josephb,Alex 
Type: Update 
Category: Computers 
Subject: fb40m down for patching 

The 40m frame builder is currently being patched to be able utilize the full 14 TB of the new raid array (as opposed to being limited to 2 TB).  This process is expected to take several hours, during which the frame builder will be unavailable.

ELOG V3.1.3-