40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Fri Dec 18 22:59:12 2020, Jon, Configuration, CDS, Updated CDS upgrade plan 
|
Mon Dec 21 09:28:50 2020, Jamie, Configuration, CDS, Updated CDS upgrade plan
|
Wed Dec 23 23:06:45 2020, gautam, Configuration, CDS, Updated CDS upgrade plan
|
Tue Jan 19 14:05:25 2021, Jon, Configuration, CDS, Updated CDS upgrade plan 
|
Tue Jan 19 15:43:24 2021, gautam, Configuration, CDS, Updated CDS upgrade plan
|
|
Message ID: 15738
Entry time: Fri Dec 18 22:59:12 2020
Reply to this: 15742
15746
|
Author: |
Jon |
Type: |
Configuration |
Category: |
CDS |
Subject: |
Updated CDS upgrade plan |
|
|
Attached is the layout for the "intermediate" CDS upgrade option, as was discussed on Wednesday. Under this plan:
-
Existing FEs stay where they are (they are not moved to a single rack)
-
Dolphin IPC remains PCIe Gen 1
-
RFM network is entirely replaced with Dolphin IPC
Please send me any omissions or corrections to the layout. |
|
|