Entry  Wed Nov 18 22:49:06 2020, gautam, Update, ASC, Some thoughts about AS WFS electronics 
    Reply  Sun Nov 22 21:09:37 2020, gautam, Update, ASC, Planned mods for WFS head aLIGO_wfs_v5_40m.pdfTFs.pdfnoise.pdf
       Reply  Wed Nov 25 18:18:41 2020, gautam, Update, ASC, Planned mods for WFS head anodeVsOutput.pngsensitivity.png
          Reply  Sat Nov 28 21:44:53 2020, rana, Update, ASC, Planned mods for WFS head 
          Reply  Thu Dec 10 22:46:57 2020, gautam, Update, ASC, WFS head assembled aLIGO_wfs_v5_40m.pdfTF_meas.pdf
             Reply  Thu Dec 17 15:23:56 2020, gautam, Update, ASC, WFS head characterization oNoise.pdfZ_Hi.pdfZ_Low.pdfIMG_9030.jpgiNoise.pdf
    Reply  Wed Nov 25 18:30:23 2020, gautam, Update, ASC, Some thoughts about AS WFS electronics 
       Reply  Wed Dec 2 23:07:19 2020, gautam, Update, ASC, Electrical LO signal for AS WFS RF_Frequency_Source.pdf
          Reply  Thu Dec 3 11:02:35 2020, rana, Update, Electronics, Electrical LO signal for AS WFS 
          Reply  Thu Dec 3 13:55:52 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
             Reply  Thu Dec 3 20:38:46 2020, gautam, Update, ASC, Electrical LO signal for AS WFS RF_Frequency_Source.pdfdemodPath.pdfEOMpath.pdf
                Reply  Thu Dec 3 21:14:38 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
                   Reply  Thu Dec 3 21:44:49 2020, gautam, Update, ASC, Electrical LO signal for AS WFS 
                      Reply  Fri Dec 4 03:02:40 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
                         Reply  Fri Dec 4 22:41:56 2020, gautam, Update, ASC, Freq Gen Box revamp 
                            Reply  Sat Dec 5 20:44:35 2020, gautam, Update, ASC, Freq Gen Box re-installed 6x
                               Reply  Mon Dec 7 12:38:51 2020, gautam, Update, IOO, IMC loop char OLTFcomparison.pdfdemodMons.pdfOLTFcomparison.pdf
                               Reply  Mon Dec 7 22:54:30 2020, gautam, Update, LSC, Modulation depth measurement modDepth.pdf
                                  Reply  Sat Jan 16 18:59:44 2021, gautam, Update, LSC, Modulation depth measurement PLL.pdfmodDepth.pdfmodProfile.pdfEOMpath_postMod.pdf
Message ID: 15691     Entry time: Sat Nov 28 21:44:53 2020     In reply to: 15689
Author: rana 
Type: Update 
Category: ASC 
Subject: Planned mods for WFS head 

I don't think your simulation looked inaccurate (at least not to me). In my opinion, we just want to minimize any excess noise from intermodulation. Of course, its possible that stuffing too many notches will make it difficult to have the same low noise as a simple circuit, so that's worth considering.

Also, the intermodulation is mainly a problem when the other peaks are not suppressed by some feedback: e.g. POP55_I can have excess noise if POP55_Q or POP11_I are not controlled by some MICH/PRCL/SRCL loops.

For the WFS, perhaps this is not a significant issue, but I'm not sure. My suggestion is to stuff 11 & 55 for sure, and then the others depending on the amplitude of the peaks and the consequent intermodulation. IF it works with all stuffed, that seems good. If its tricky to get it to work with all stuffed, I'd back off on a couple of them...but it probably takes more careful thought to figure out which ones are least important.