Entry  Wed Oct 28 20:42:53 2020, Koji, Update, General, Vent Prep 10x
    Reply  Thu Oct 29 12:43:35 2020, gautam, Update, General, Vent Prep preVentAlignment.pngPRMIcarr_PRMalignment.pngALS_ool.pdflowPowerMC.png
       Reply  Thu Oct 29 19:30:56 2020, gautam, Update, General, Vent complete ventValveStatus.pngvent_Oct2020.jpgventValveStatus_overnight.pnglowPowerIMC_afterVent.png
          Reply  Mon Nov 2 12:44:25 2020, gautam, Update, General, ETMY and OMC chamber heavy doors off CB84FD62-C48B-414F-8825-50C9DE0B47CF.jpeg
             Reply  Mon Nov 2 16:46:06 2020, gautam, Update, General, Plan for OMC chamber IMG_2318.JPGIMG_2332.JPG
                Reply  Mon Nov 2 17:13:19 2020, Koji, Update, General, Plan for OMC chamber 
                   Reply  Mon Nov 2 17:32:05 2020, gautam, Update, General, Plan for OMC chamber IMG_2317.JPG
Message ID: 15656     Entry time: Mon Nov 2 17:32:05 2020     In reply to: 15655
Author: gautam 
Type: Update 
Category: General 
Subject: Plan for OMC chamber 

Good point - looking back, I also see that I already removed the mirror at the SW corner of the table in 2016. Revised photo in Attachment #1. There is an optic on the east edge of this table whose purpose I'm not sure of, but I'm pretty sure it isn't essential to the main functionality and so can be removed.

Quote:

I believe the mirror next to IM1 is for the green beams to be delivered to the PSL table. I think we still want to keep it. Otherwise, the plan looks fine.

Attachment 1: IMG_2317.JPG  2.996 MB  | Hide | Hide all
IMG_2317.JPG