40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu May 7 18:12:12 2009, pete, Update, Locking, arm power curve 2009_may_7_powers.jpg
    Reply  Thu May 7 23:21:04 2009, pete, Update, Locking, arm power curve 
Message ID: 1558     Entry time: Thu May 7 23:21:04 2009     In reply to: 1557
Author: pete 
Type: Update 
Category: Locking 
Subject: arm power curve 

Quote:

I've plotted TRX, TRY, PD12I and PD11Q.  Arm powers after locking increase for a few tens of minutes, peak out, and then decrease before lock is lost.

 

 

 I should have mentioned that the AS port camera image seems to get progressively uglier over the course of these locks.  Maybe we can use the JoeCam to make a movie of it. 

ELOG V3.1.3-