40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Sep 7 23:49:14 2020, gautam, Update, BHD, A first look at RF44 scheme 
    Reply  Tue Sep 8 01:31:43 2020, Koji, Update, BHD, A first look at RF44 scheme 
    Reply  Wed Sep 9 00:05:18 2020, gautam, Update, BHD, More notes on the RF44 scheme IMG_3397.JPGphaseNoisePSD.pdfmagnitudeHist.pdfLOpowerDrift.png
       Reply  Tue Sep 15 22:11:52 2020, gautam, Update, BHD, More notes on the RF44 scheme RF44.pdf
Message ID: 15563     Entry time: Tue Sep 8 01:31:43 2020     In reply to: 15562
Author: Koji 
Type: Update 
Category: BHD 
Subject: A first look at RF44 scheme 

- Loose fiber coupler: Sorry about that. I could not detect something was loose there, although some of the locks were not tightened.

- S incident instead of P: Sorry about that too. I completely missed that the IMC takes S-pol.

ELOG V3.1.3-