40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Aug 24 08:13:56 2020, Jon, Update, VAC, UPS installation 
    Reply  Mon Aug 24 11:25:07 2020, Jon, Update, VAC, UPS installation 
Message ID: 15537     Entry time: Mon Aug 24 08:13:56 2020     Reply to this: 15538
Author: Jon 
Type: Update 
Category: VAC 
Subject: UPS installation 

I'm in the lab this morning to interface the two new UPS units with the digital controls system. Will be out by lunchtime. The disruptions to the vac system should be very brief this time.

ELOG V3.1.3-