Entry  Mon Jun 22 10:43:25 2020, Jon, Configuration, VAC, Vac maintenance at 11 am 
    Reply  Mon Jun 22 20:06:06 2020, Jon, Configuration, VAC, Vac maintenance complete Pumpdown-6-22-20.png
       Reply  Tue Jun 23 17:54:56 2020, rana, Configuration, VAC, Vac maintenance complete 
Message ID: 15421     Entry time: Mon Jun 22 10:43:25 2020     Reply to this: 15424
Author: Jon 
Type: Configuration 
Category: VAC 
Subject: Vac maintenance at 11 am 

The vac system is going down at 11 am today for planned maintenance:

  • Re-install the repaired TP2 and TP3 dry pumps [ELOG 15417]
  • Incorporate an auto-mailer and flag channel into the controls code for signaling tripped interlocks [ELOG 15413]

We will advise when the work is completed.