40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed May 20 19:34:58 2020, Koji, Update, General, ITM spares and New PR3 mirrors transported to Downs for phasemap measurement container.jpg
    Reply  Thu Jun 4 00:21:28 2020, Koji, Summary, COC, ITM spares and New PR3 mirrors transported to Downs for phasemap measurement 
    Reply  Tue Jun 16 13:05:36 2020, Koji, Update, COC, ITM spares and New PR3 mirrors transported to Downs for phasemap measurement 40m_Optics.jpg
Message ID: 15401     Entry time: Tue Jun 16 13:05:36 2020     In reply to: 15340
Author: Koji 
Type: Update 
Category: COC 
Subject: ITM spares and New PR3 mirrors transported to Downs for phasemap measurement 

ITMU01 / ITMU02 as well as the five E1800089 mirrors came back to the 40m. Instead, the two ETM spares (ETMU06 / ETMU08) were delivered to GariLynn.
Jordan worked on transportation.

Note that the E1800089 mirrors are together with the ITM container in the precious optics cabinet.

Attachment 1: 40m_Optics.jpg  2.287 MB  Uploaded Tue Jun 16 14:06:57 2020  | Hide | Hide all
40m_Optics.jpg
ELOG V3.1.3-