Tue May 26 02:15:36 2020, gautam, Update, LSC, Lock acquisition portal entry
|
Tue May 26 02:31:00 2020, gautam, Update, LSC, Lock acquisition sequence
|
Wed May 27 20:14:51 2020, Koji, Update, LSC, Lock acquisition sequence
|
Tue May 26 02:37:19 2020, gautam, Update, LSC, DARM loop measurement and fitting 
|
Tue May 26 03:01:35 2020, gautam, Update, LSC, CARM loop
|
Wed Jun 3 01:46:14 2020, gautam, Update, LSC, CARM loop    
|
Tue May 26 03:06:59 2020, gautam, Update, LSC, PRFPMI sensing matrix 
|
Tue May 26 03:26:58 2020, gautam, Update, LSC, Preliminary noise budget
|
Tue May 26 14:32:44 2020, gautam, Update, LSC, Arm transmission RIN
|
Wed May 27 19:36:33 2020, Koji, Update, LSC, Arm transmission RIN
|
Thu May 28 18:36:45 2020, gautam, Update, LSC, Arm transmission RIN  
|
Fri May 29 00:34:57 2020, rana, Update, LSC, Arm transmission RIN
|
Wed Jun 3 02:14:32 2020, gautam, Update, ASC, PRC ASC improves arm transmission RIN    
|
Fri Jun 19 16:30:09 2020, gautam, Update, ASC, Some thoughts about ASC 
|
Tue Jul 7 14:06:10 2020, gautam, Update, ASC, Some more thoughts about ASC
|
Tue May 26 16:00:06 2020, gautam, Update, LSC, Power buildup diagnostics 
|
Wed May 27 17:41:57 2020, Koji, Update, LSC, Power buildup diagnostics
|
Wed Jun 3 02:08:00 2020, gautam, Update, LSC, Power buildup diagnostics 
|
Wed Jun 3 01:34:53 2020, gautam, Update, LSC, Lock acquisition update portal
|
Wed Jun 3 03:29:26 2020, Koji, Update, LSC, Lock acquisition update portal
|
Wed Jun 3 11:40:56 2020, gautam, Update, LSC, Lock acquisition update portal
|
Wed Jun 3 18:49:47 2020, gautam, Update, LSC, PRG and CARM signal sign   
|
|
Message ID: 15367
Entry time: Wed Jun 3 02:08:00 2020
In reply to: 15358
|
Author: |
gautam |
Type: |
Update |
Category: |
LSC |
Subject: |
Power buildup diagnostics |
|
|
Attachments #1 and Attachments #2 are in the style of elog15356, but with data from a more recent lock. It'd be nice to calibrate the ASDC channel (and in general all channels) into power units, so we have an estimate of how much sideband power we expect, and the rest can be attributed to carrier leakage to ASDC.
On the basis of Attachments #1, the PRG is ~19, and at times, the arm transmission goes even higher. I'd say we are now in the regime where the uncertainty of the losses in the recycling cavity - maybe beamsplitter clipping? is important in using this info to try and constrain the arm cavity losses. I'm also not sure what to make of the asymmetry between TRX and TRY. Allegedly, the Y arm is supposed to be lossier.
Quote: |
This is very interesting. Do you have the ASDC vs PRG (~ TRXor TRY) plot? That gives you insight on what is the cause of the low recycling gain.
|
|
|
|
|
|