40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 1526     Entry time: Tue Apr 28 04:30:16 2009
Author: Yoichi 
Type: Update 
Category: Locking 
Subject: RF full lock 
Yoichi, Peter

I believe we have succeeded in the full lock of the interferometer with the RF signals.
The lock process is reasonably robust and repeatable.

I did a scan of the RF CARM offset and plotted the arm power as a function of the CARM offset (see the attachment).
The arm power goes maximum at non-zero CARM offset. I guess the RF CARM error signal has some offset.
Maybe the demodulation phase is wrong ? I will tweak this tomorrow.
The script to do this scan can be found at /cvs/cds/caltech/scripts/CM/CARMSweep.

I haven't tried DC readout yet.
Attachment 1: Sweep1.png  165 kB  | Hide | Hide all
Sweep1.png
ELOG V3.1.3-