40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Mon Mar 2 16:29:40 2020, gautam, Update, Electronics, c1psl VME crate removed, Acro-crate installed
|
Tue Mar 3 17:20:14 2020, gautam, Update, Electronics, More cabling removed
|
Wed Mar 4 16:18:31 2020, gautam, Update, Electronics, More cabling removed 
|
Wed Mar 4 21:02:49 2020, Koji, Update, Electronics, More cabling removed
|
Tue Mar 3 17:59:33 2020, Yehonathan, Update, Electronics, PSL Shutter and PMC TRANSPD working
|
Thu Mar 5 15:03:48 2020, Yehonathan, Update, Electronics, PSL Shutter and PMC TRANSPD working
|
Thu Mar 5 19:45:23 2020, Jon, Summary, PSL, C1PSL in-situ test results
|
Wed Mar 11 18:12:53 2020, gautam, Summary, PSL, WFS Demod board modifications
|
|
Message ID: 15242
Entry time: Tue Mar 3 17:20:14 2020
In reply to: 15238
Reply to this: 15249
|
Author: |
gautam |
Type: |
Update |
Category: |
Electronics |
Subject: |
More cabling removed |
|
|
Jordan and I removed another 10 kg of cabling from 1X2. The c1iool0 crate now has all cabling to it disconnected - but it remains in the rack because I can't think of a good way to remove it without disturbing a bunch of cabling to the fast c1iool0 machine. We can remove it the next time the vertex FEs crash. Cross connects have NOT been removed - we will identify which cross connects are not connected to the fast system and trash those.
Do we want to preserve the ability to use the PZT driver in 1X2? |