40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Mar 2 16:29:40 2020, gautam, Update, Electronics, c1psl VME crate removed, Acro-crate installed c1psl.pdf
    Reply  Tue Mar 3 17:20:14 2020, gautam, Update, Electronics, More cabling removed 
       Reply  Wed Mar 4 16:18:31 2020, gautam, Update, Electronics, More cabling removed 1X2EuroBefore.JPGIOO.png
          Reply  Wed Mar 4 21:02:49 2020, Koji, Update, Electronics, More cabling removed 
    Reply  Tue Mar 3 17:59:33 2020, Yehonathan, Update, Electronics, PSL Shutter and PMC TRANSPD working 
       Reply  Thu Mar 5 15:03:48 2020, Yehonathan, Update, Electronics, PSL Shutter and PMC TRANSPD working 
          Reply  Thu Mar 5 19:45:23 2020, Jon, Summary, PSL, C1PSL in-situ test results c1psl_feedthrough_wiring_-_By_Connector_(3).pdf
             Reply  Wed Mar 11 18:12:53 2020, gautam, Summary, PSL, WFS Demod board modifications D980233-B_Mar2020Mods.pdf
Message ID: 15242     Entry time: Tue Mar 3 17:20:14 2020     In reply to: 15238     Reply to this: 15249
Author: gautam 
Type: Update 
Category: Electronics 
Subject: More cabling removed 

Jordan and I removed another 10 kg of cabling from 1X2. The c1iool0 crate now has all cabling to it disconnected - but it remains in the rack because I can't think of a good way to remove it without disturbing a bunch of cabling to the fast c1iool0 machine. We can remove it the next time the vertex FEs crash. Cross connects have NOT been removed - we will identify which cross connects are not connected to the fast system and trash those. 

Do we want to preserve the ability to use the PZT driver in 1X2?