40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Feb 26 21:43:48 2020, Jon, Summary, BHD, Projected IFO noise budget, post-BHD upgrade 40m_phase_quad.pdf40m_aligo_comp.pdf40m_ampl_quad.pdfnoise_budget.tar
    Reply  Wed Feb 26 22:09:52 2020, gautam, Summary, BHD, Projected IFO noise budget, post-BHD upgrade 
       Reply  Mon Mar 2 23:49:03 2020, Jon, Summary, BHD, Projected IFO noise budget, post-BHD upgrade 40m_phase_quad.pdf40m_ampl_quad.pdf40m_aligo_comp.pdf
          Reply  Tue Mar 3 18:11:05 2020, Jon, Summary, BHD, Projected IFO noise budget, post-BHD upgrade 40m_phase_quad.pdf40m_ampl_quad.pdf40m_aligo_comp.pdf
Message ID: 15241     Entry time: Mon Mar 2 23:49:03 2020     In reply to: 15228     Reply to this: 15244
Author: Jon 
Type: Summary 
Category: BHD 
Subject: Projected IFO noise budget, post-BHD upgrade 

Updated noise budget curves, now computed using the latest version of pygwinc. This resolves the inconsistency between the gwinc quantum noise curves and Gautam's analytic calculations. As before, the key configuration parameters are listed in the figure titles.

Attachment 1: Phase quadrature

Attachment 2: Amplitude quadrature

Attachment 3: Comparison to aLIGO design (phase quadrature)

Quote:

The quantum noise curves here are not correct. c.f. amplitude quadrature noise budget.

Attachment 1: 40m_phase_quad.pdf  32 kB  | Hide | Hide all
40m_phase_quad.pdf
Attachment 2: 40m_ampl_quad.pdf  32 kB  | Hide | Hide all
40m_ampl_quad.pdf
Attachment 3: 40m_aligo_comp.pdf  27 kB  | Hide | Hide all
40m_aligo_comp.pdf
ELOG V3.1.3-