Mon Mar 2 16:29:40 2020, gautam, Update, Electronics, c1psl VME crate removed, Acro-crate installed
|
Tue Mar 3 17:20:14 2020, gautam, Update, Electronics, More cabling removed
|
Wed Mar 4 16:18:31 2020, gautam, Update, Electronics, More cabling removed 
|
Wed Mar 4 21:02:49 2020, Koji, Update, Electronics, More cabling removed
|
Tue Mar 3 17:59:33 2020, Yehonathan, Update, Electronics, PSL Shutter and PMC TRANSPD working
|
Thu Mar 5 15:03:48 2020, Yehonathan, Update, Electronics, PSL Shutter and PMC TRANSPD working
|
Thu Mar 5 19:45:23 2020, Jon, Summary, PSL, C1PSL in-situ test results
|
Wed Mar 11 18:12:53 2020, gautam, Summary, PSL, WFS Demod board modifications
|
|
Message ID: 15238
Entry time: Mon Mar 2 16:29:40 2020
Reply to this: 15242
15243
|
Author: |
gautam |
Type: |
Update |
Category: |
Electronics |
Subject: |
c1psl VME crate removed, Acro-crate installed |
|
|
[JV, JWR, YD, GV]
- The old c1psl VME crate, and all the ribbon cables connected to it were removed from 1X1. They are presently dumped in the office area - we will clear these in the next few days, once the c1iool0 crate also gets removed from the rack.
- The Acromag crate was capped on the top and bottom, had ears bolted on, and was installed on support rails in the newly cleared up space.
- The strange orientation of the crate (with the intended backside facing the front of the rack) is to facilitate easy access to the "spare" channels we have in this box, e.g. for a future ISS or laser amplifier.
- Remaining connections to make are (these will be done tomorrow along with the extrication of the c1iool0 VME crate):
- PMC trans PD
- FSS RMTEMP
- PSL shutter
- 2W Mephisto diagnostic connector
- 24 V DC from Sorensens via DIN connector (we are waiting on a new power cable to arrive).
|
|
|