40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Dec 11 15:01:57 2019, Jon, Summary, PSL, PMC cavity ringdown measurement IMG_0101.jpg
    Reply  Thu Dec 12 19:20:43 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement IMG_0105.jpegTEK00001.PNG20191212_151642.jpg
       Reply  Fri Dec 13 12:28:43 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement Ringdown_InitialProcess.pdf
          Reply  Tue Dec 17 20:45:30 2019, rana, Update, PSL, PMC cavity ringdown measurement 
          Reply  Fri Dec 27 15:01:02 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement PDAOMResponse.pdfPMCTransmission.pdfRingdownsAndRefs.pdfTwoExponentialFitAOM0.3V.pdf
             Reply  Tue Dec 31 03:03:02 2019, gautam, Update, PSL, PMC cavity ringdown measurement 
       Reply  Mon Dec 16 18:19:42 2019, shruti, Update, PSL, PMC cavity ringdown measurement : beat-note disruption IMG_0040.jpg
Message ID: 15107     Entry time: Tue Dec 31 03:03:02 2019     In reply to: 15105
Author: gautam 
Type: Update 
Category: PSL 
Subject: PMC cavity ringdown measurement 

When I was looking at this, the AOM shutdown time was measured to be ~120 ns, and while I wasn't able to do a ringdown measurement with the PMC (it'd just stay locked because at the time i was using the zeroth order beam), the PMC transmission decayed in <200 ns. 

ELOG V3.1.3-