Entry  Fri Sep 20 12:55:02 2019, gautam, Update, CDS, c1iscaux testing 
    Reply  Mon Sep 23 10:49:34 2019, rana, Update, CDS, c1iscaux testing 
    Reply  Wed Sep 25 20:10:13 2019, Koji, Update, CDS, c1iscaux testing testDetectMons_190925.pngtestIPPOS_190925.png
       Reply  Thu Sep 26 20:09:40 2019, Koji, Update, CDS, c1iscaux testing Wht1.pdfWht2.pdfWht3.pdfWht4.pdflock.png
          Reply  Fri Sep 27 15:59:53 2019, gautam, Update, CDS, c1iscaux testing 
          Reply  Wed Oct 2 01:11:40 2019, Koji, Update, CDS, c1iscaux testing 8x
             Reply  Fri Oct 4 01:57:09 2019, Koji, Update, CDS, c1iscaux testing P_20191003_172956_vHDR_On.jpgTF.pdfPSD.pdf191003_AA_Filter.zip
                Reply  Sat Oct 5 00:03:21 2019, Koji, Update, CDS, c1iscaux testing REFL1_GAIN1.pdfREFL1_GAIN2.pdfREFL2_GAIN1.pdfREFL2_GAIN2.pdf
                   Reply  Tue Oct 8 03:32:42 2019, Koji, Update, CDS, CM servo board testing 7x
                      Reply  Tue Oct 8 17:59:29 2019, Koji, Update, CDS, CM servo board testing (portal) 6x
                         Reply  Tue Oct 8 18:42:39 2019, Koji, Update, CDS, CM servo board testing boosts.pdf
                            Reply  Mon Oct 14 16:06:28 2019, Koji, Update, CDS, CM servo board testing pole_zero_filter.pdf
                               Reply  Mon Oct 14 16:19:30 2019, Koji, Update, CDS, CM servo board testing testb2.pdf
                                  Reply  Mon Oct 14 16:25:03 2019, Koji, Update, CDS, CM servo board testing servo_out.pdf
                                     Reply  Mon Oct 14 16:34:42 2019, Koji, Update, CDS, CM servo board testing in12_output_offset.pdfin12_input_offset.pdfin12_input_offset2.pdf
                                        Reply  Mon Oct 14 17:32:28 2019, Koji, Update, CDS, Portal Elog entry for the recent CM servo board tests CM_Servo_Diagram.png
                         Reply  Tue Oct 8 20:23:03 2019, gautam, Update, CDS, c1iscaux testing 
    Reply  Mon Sep 30 11:20:43 2019, gautam, Update, CDS, c1iscaux testing - CM board code updated CMsoftTest.png
       Reply  Mon Sep 30 15:51:59 2019, gautam, Update, CDS, c1iscaux - some admin 
Message ID: 14970     Entry time: Mon Oct 14 17:32:28 2019     In reply to: 14968
Author: Koji 
Type: Update 
Category: CDS 
Subject: Portal Elog entry for the recent CM servo board tests 

Updated Circuit Diagram and photos: https://dcc.ligo.org/D1500308-v2

- (1) and (6) of the diagram: TFs with various gain slider values for REFL1/REFL2/AO GAIN [ELOG 14948] (gain values and time delay modeling)
- Switching checks, latest photo of the board, Limiter check  [ELOG 14953]
- (2): Boost transfer functions [ELOG 14955]
- (3): Slow (aka Length) CM output path [ELOG 14965]
- (4): Pole-Zero filter TF [ELOG 14965]
- (5): TF from TESTA2 to TESTB2 [ELOG 14966]
- (6): AC coupling TF of the AO GAIN stage [ELOG 14967]
- (7): AC coupling TF of the IN2 stage on IMC servo board [ELOG 15044]

Slow path = (1)*(2 if necessary)*(3)*(4 if necessary)

Fast path = (1)*(2 if necessary)*(4 if necessary)*(5)*(6)

gautam 20191122: Adding the measured AC coupling of the IN2 input of the IMC servo board for completeness.