40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Jul 16 16:00:01 2019, gautam, Update, CDS, c1iscaux Supermicro setup IMG_7769.JPG
    Reply  Wed Jul 17 21:22:41 2019, gautam, Update, CDS, CM board Latch Enable subtlety 
       Reply  Sun Jul 21 12:55:38 2019, gautam, Update, CDS, CM board Latch Enable test script LatchLogic.pdfLatchLogicTest.png
          Reply  Fri Aug 9 08:59:04 2019, gautam, Update, CDS, Prep for install of c1iscaux 
             Reply  Sun Aug 11 11:47:42 2019, gautam, Update, CDS, Bench test of c1iscaux 
                Reply  Mon Aug 12 17:36:04 2019, gautam, Update, CDS, More bench test of c1iscaux iscauxCheclist.pdf
                   Reply  Mon Aug 12 21:25:19 2019, Koji, Update, CDS, More bench test of c1iscaux 
                   Reply  Tue Aug 13 08:07:09 2019, gautam, Update, CDS, P1--->P2 
                      Reply  Tue Aug 13 14:36:17 2019, gautam, Update, CDS, P1--->P2 
                   Reply  Fri Aug 16 16:40:04 2019, gautam, Update, CDS, 1Y3 work newLook1Y3.JPGIMG_7803.JPGc1lsc_crashed.png
                      Reply  Sat Aug 17 16:49:23 2019, gautam, Update, CDS, More 1Y3 work Screen_Shot_2019-08-17_at_3.00.57_PM.pngScreen_Shot_2019-08-17_at_3.12.23_PM.pngIMG_7804.JPGScreenshot_from_2019-08-17_17-04-47.png
                         Reply  Mon Aug 19 14:36:21 2019, gautam, Update, CDS, c1iscaux remaining work caseForSmallerFootprint.pdf
                            Reply  Tue Aug 20 19:05:24 2019, Koji, Update, CDS, MC1 (and MC3) troubleshoot Screenshot_from_2019-08-20_17-26-01.pngScreenshot_from_2019-08-20_17-43-03.png
                               Reply  Thu Aug 22 12:54:06 2019, Koji, Update, CDS, MC1 glitch removed (for now) and IMC locking recovered 7x
                                  Reply  Thu Aug 22 20:56:51 2019, Koji, Update, CDS, MC1 glitch removed (for now) and IMC locking recovered 
                            Reply  Fri Aug 23 18:46:17 2019, Jon, Update, CDS, c1iscaux remaining work 
                               Reply  Sun Aug 25 14:18:08 2019, gautam, Update, CDS, c1iscaux remaining work Screen_Shot_2019-08-25_at_10.38.37_PM.png
    Reply  Thu Jul 18 10:46:04 2019, gautam, Update, CDS, Database files made 
       Reply  Thu Jul 18 19:58:56 2019, gautam, Update, CDS, Work on Acromag chassis IMG_7771.JPGIMG_7770.JPGIMG_7772.JPG
          Reply  Fri Jul 19 19:44:03 2019, gautam, Update, CDS, Database file test Whitening.png
Message ID: 14837     Entry time: Fri Aug 9 08:59:04 2019     In reply to: 14790     Reply to this: 14840
Author: gautam 
Type: Update 
Category: CDS 
Subject: Prep for install of c1iscaux 

[chub, gautam]

We scoped out the 1Y3 rack this morning to figure out what needs to be done hardware wise. We did not think about how to power the Acromag crate - the LSC rack electronics are all powered by linear supplies and not Sorensens, and the linear supplies are operating at pretty close to their maximum current-drive. The Acromag box draws ~3A of current from the 20 V supply, not sure what the current draw will be from the 15 V supply. Options:

  1. Since there are sorensens in 1Y2 and 1Y1, do we really care about installing another pair of switching supplies (+20 V DC and +15 V DC) in 1Y3?
    • Contingent on us having two spare Sorensens available in the lab. Chub has already located one.
  2. Use the Sorensens installed already in 1Y1. 
    • Probably the easiest and fastest option.
    • +15 V already available, we'd have to install a +20 V one (or if the +/-5 V or +12 V is unused, reconfigure for +20 V DC).
    • Can argue that "this doesn't make the situation any worse than it already is"
    • Will require the running of some long (~3 m) long cabling to bring the DC power to 1Y3 where it is required. 
  3. Get new linear supplies, and hook them up in parallel with the existing.
    • Need to wait for new linear supply to arrive
    • Probably expensive
    • Questionable benefit to electronics noise given the uncharacterized RF pickup situation at 1Y2

I'm going with option #2 unless anyone has strong objections.